Loading data...
Many city planners are convinced that classic streetcars can ignite economic development in a way that buses cannot and at a fraction of the expense of light rail.
Read More →The multi-phase plan creates an interconnected transit system, redesigns the local and express bus systems, and adds 12 new high-frequency, color-coded bus routes that improve connections to jobs and other transit modes.
Read More →The funds are made available through FTA’s Transit-Oriented Development Planning Pilot Program for communities that are developing new or improved mass transit systems.
Read More →Adaptability and flexibility are the characteristics of BRT Line that are considered to be its most favorable aspects as they can be configured according to each projec.
Read More →The trains, equipped with Wi-Fi, LED lighting and real-time passenger information systems, provide access for a quick passenger flow.
Read More →The Transit GO Ticket app pilot project was created under contract by Bytemark, which has similar systems in use in Austin, Texas; Massachusetts DOT; and Atlanta.
Read More →Transit program is receiving $1.26 million in stimulus funding, most of which will be spent to procure three new buses at a cost of about $332,000 each, for a total of $996,000.
Read More →Software provider ranked by magazine’s Inc. 5,000 list of the fastest-growing private companies in the U.S. Acknowledged because of its revenue growth of 208.2 percent from 2005 to 2008. Ranked 1,528 on the overall list.
Read More →The advanced bus chassis and body manufactured by New Flyer, features ISE’s hybrid-electric fuel cell drive system, which incorporates a 150kW fuel cell manufactured by Ballard Power Systems.
Read More →Allows "mechanics to easily identify the correct part the first time, and then transfer the part numbers from the web based parts catalog into a requisition directly within the AssetWorks application, automating the parts ordering process."
Read More →