METRO Magazine Logo
MenuMENU
SearchSEARCH

San Diego MTS Approves New All-Electric Bus Route

Service is anticipated to begin as early as this fall.

San Diego MTS Approves New All-Electric Bus Route

Rapid 227 will provide a battery-electric operated Rapid service in San Diego’s South Bay.

Photo: San Diego MTS

2 min to read


The Metropolitan Transit System (MTS) announced its board of directors approved Rapid 227 (Iris Rapid) as part of the region’s growing Bus Rapid Transit (BRT) network. 

Service is anticipated to begin as early as this fall, according to MTS' news release.

Ad Loading...

Rapid 227 will provide a battery-electric operated Rapid service in San Diego’s South Bay, linking the Otay Mesa Transit Center to neighborhoods along the Imperial Beach shores. The future route will also connect riders with the UC San Diego Blue Line Trolley at the Iris Avenue Transit Center.

“The beginning of the region’s first electric Rapid route is a huge leap forward towards a greener future, environmental justice, sustainability, and better air quality,” said Nathan Fletcher, MTS Board chair. “When Iris Rapid is in full operation, MTS will have 25 electric buses operating in its fleet, with hundreds more on the way. This will be a great milestone to reach as we transition to an all-zero emissions bus fleet by 2040.”

Powering Rapid 227 are 12 60-foot battery-electric buses provided by New Flyer of America Inc. (New Flyer). New Flyer has supplied more than 600 buses to MTS in the past 30 years. The new battery-electric buses are currently in various stages of production and will soon begin arriving in San Diego.

“Our binational region will benefit greatly with the addition of Iris Rapid,” said Vivian Moreno, MTS Board member. “In 2021, 2.1 million pedestrians crossed the border northbound at the Otay Mesa Port of Entry. Thousands of those commuters use our bus system daily to get to jobs and education opportunities. Iris Rapid will reduce emissions, speed up trips, offer better amenities, and provide longer spans of service. This is the type of bus service that both South Bay and Baja residents deserve.”

The new electric buses serving Rapid 227 will be stationed out of the agency’s bus facility in Chula Vista. At this bus division, MTS is finalizing construction of a new $8.5 million overhead gantry charging system capable of charging 24 battery-electric buses at a time and will be expandable to add more charging capacity as MTS transitions to an all-electric fleet in the coming years.

Ad Loading...

The total cost of the Rapid 227 project is $37 million to purchase the 12 battery-electric buses and add the necessary infrastructure. Funding came from a mix of California Transit and Intercity Rail Capital Program and Low Carbon Transit Operations Program grants, and MTS’s Capital Improvement Program.

More Bus

Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Ad Loading...
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Ad Loading...
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →
David Carol, Baker Alloush, and Jesse Lazarus from METRO's People Movement February 4 edition.
Managementby Staff and News ReportsFebruary 4, 2026

New Rolling Stock Strategy Lead at New York MTA and More in People Movement

In this edition, we cover recent appointments and announcements at HDR, NCTD, STV, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Ad Loading...
King County Metro electric buses made by GILLIG.
Busby StaffJanuary 30, 2026

Seattle's King County Metro Introduces New Battery-Electric Buses

Rolling out in electric yellow and seafoam blue, the first battery-electric buses purchased from GILLIG will begin serving riders in south King County on February 2.

Read More →