
CTDOT Launches Four-Station Upgrades on Waterbury Line
Construction on all four stations is beginning now and is anticipated to be completed by spring 2028.
Read More →
Construction on all four stations is beginning now and is anticipated to be completed by spring 2028.
Read More →
Just like more recent models of Sun Vans, the new Glaval models still carry up to 14 riders, with room for as many as three wheelchair passengers.
Read More →
The five-year contract, covering the period from 2020 to 2024, calls for the delivery of 497 40-foot hybrid buses LFS HEV and up to 1,028 vehicles on option.
Read More →
Registration is open now for this year's show, which will include a look at electric buses and autonomous vehicles, as well as training courses from NTI and EnerDel.
Read More →
The savings are based on the cost of commuting by public transportation compared to the cost of owning and driving a vehicle.
Read More →
Will use system to evaluate route network scenarios and their impacts on riders, as well as to develop optimized timetables for the revamped service.
Read More →
The first two integrations are with Calif.'s Transportation Authority of Marin and the Big Blue Bus in Santa Monica.
Read More →
Will utilize the $3.18 million grant to replace diesel and gas-fueled shuttle buses at the four major airports in Southern California with zero-emission battery-electric shuttles.
Read More →
The order includes the 15 buses for inventory and demonstration that are on order with GreenPower.
Read More →
Fadi Chakbazof will be responsible for all operations in the west region, reporting directly to Beverly Edwards, COO.
Read More →
To receive seal, 75% of the service technicians at a location must be certified by ASE.
Read More →