Bombardier wins 2 contracts for first monorail systems in Thailand
Will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72, four-car Innovia Monorail 300 trains
Bombardier Transportation announced two contracts for its Bombardier Innovia Monorail 300 system for two mass rapid transit lines in Bangkok. This will improve the commute for more than 400,000 people every day. The contracts are with the Northern Bangkok Monorail Co. Ltd. (NBM) and the Eastern Bangkok Monorail Co. Ltd. (EBM), responsible for the turnkey construction and 30-year concession of the new, elevated lines.
Bombardier will design and supply the mechanical and electrical elements for the two monorail lines and deliver a combined total of 72, four-car Innovia Monorail 300 trains (288 cars) equipped with Bombardier Cityflo 650 automatic train control technology for driverless operation.
Ad Loading...
The contract with NBM concerns the new Khae Rai-MinBuri (Pink) Line to operate with 42 trainsets. For EBM, scope comprises 30 trainsets for the Lat Phrao-Samrong (Yellow) Line. Furthermore, the contracts include providing the project management, systems engineering and integration, testing, and commissioning for the new trains and systems.
Operating in the city's northern and eastern areas, the monorails will integrate with the existing transportation network and run at speeds up to approximately 50 mph with a maximum capacity of over 28,000 passengers per hour, per direction.
Project delivery, system integration, and rail control solution design and implementation will be led from Bombardier's regional hub in Bangkok. The Innovia trainsets will be manufactured at the Bombardier Joint Venture Puzhen Bombardier Transportation Systems (PBTS) in China, working with Bombardier's global Monorail Product and Engineering Experts.
The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.
The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.
In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.
This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.
Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.