METRO Magazine Logo
MenuMENU
SearchSEARCH

Chicago advances BRT plans

The announcement is based on a year-long assessment of various BRT alternatives along Ashland and Western avenues. Through the results of this analysis, CTA and CDOT will prioritize BRT for Ashland Avenue to meet the needs of bus riders in this corridor.

April 19, 2013
Chicago advances BRT plans

 

2 min to read


Chicago officials announced plans to develop a vision for faster and more reliable transit in Chicago, which will include studying center-running bus rapid transit (BRT) on a 16-mile stretch of Ashland Avenue between 95th Street and Irving Park Road.

The Chicago Transit Authority (CTA) and Chicago Department of Transportation (CDOT) will also begin working with local stakeholders on developing a plan that would create faster, more reliable bus service by increasing bus speeds by more than 80% during peak travel times and create economic benefits for business and residents along the entire corridor.

Ad Loading...

The announcement is based on a year-long assessment of various BRT alternatives along Ashland and Western avenues. Through the results of this analysis, CTA and CDOT will prioritize BRT for Ashland Avenue to meet the needs of bus riders in this corridor, which has the highest ridership on CTA’s bus system and connects to seven CTA “L” stations, two Metra stations and 37 bus routes.

According to the proposed design, a dedicated center bus lane in each direction would have limited stops — every half-mile and at CTA stations as well as traffic-signal priority at intersections. New amenity-filled bus-boarding stations with enhanced, landscaped medians between stations will benefit bus riders, as well as area residents and businesses.

The vision to redesign streets to make transit more efficient includes bus-only lanes, transit signal priority and balancing the needs for all users, including autos. This vision maximizes street potential, enhances the pedestrian environment and represents the highest BRT standard.

In addition to faster travel, proposed BRT on Ashland will:

  • Save about 8 minutes per trip based on the current average trip length on the #9 Ashland bus of 2.5 miles.

Ad Loading...
  • Preserve approximately 90% of parking on both sides of the street.

  • Enhance streetscapes with more than 75 blocks of new streetscaping, including medians, better lighting, wider sidewalks and more greenery.

  • Allow the potential for pre-payment for faster boarding, similar to CTA "L" stations.

  • Preserve approximately 95% of loading zones for delivery trucks.

While BRT analysis and design efforts will continue in 2013 for 16 miles of Ashland Avenue from Irving Park Road to 95th Street, implementation would be phased and the first phase is being designed for the central area from Cortland Ave. (1800 N) to 31st Street.

Ad Loading...

Preliminary estimates show that BRT can be implemented for approximately $10 million per mile. Planning and design analysis to this point have been funded by FTA grants, which were supported by U.S. Senator Dick Durbin (D-IL) and other members of the Illinois congressional delegation.

RELATED ARTICLE: Check out, "Chicago Gets Jump on BRT."

Topics:BRTBus

More Bus

Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
Ad Loading...
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
Ad Loading...
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →
David Carol, Baker Alloush, and Jesse Lazarus from METRO's People Movement February 4 edition.
Managementby Staff and News ReportsFebruary 4, 2026

New Rolling Stock Strategy Lead at New York MTA and More in People Movement

In this edition, we cover recent appointments and announcements at HDR, NCTD, STV, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →