METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA issues RFP for next-gen railcars

The Illinois DOT is leading the multi-state locomotive procurement, with first deliveries expected in 2016.

August 12, 2013
2 min to read


The Federal Railroad Administration (FRA) invited U.S. manufacturers to submit bids to produce high-performance, next-generation diesel-electric locomotives.

The Request for Proposals (RFP) to manufacture approximately 35 new diesel-electric locomotives in America comes from a groundbreaking multi-state effort to jointly purchase standardized rail equipment to be used on state corridor routes in Illinois, Michigan, Missouri and Iowa in the Midwest and Washington, California and Oregon on the West Coast.

Ad Loading...

The Illinois Department of Transportation (IDOT) is leading the multi-state locomotive procurement, with first deliveries expected in 2016. The FRA has allocated $808 million to manufacture the next generation of passenger rail equipment including the 35 new locomotives and 130 bi-level railcars.

The engines will be built to standardized technical specifications developed by the Passenger Rail Investment and Improvement Act (PRIIA) Section 305 Next Generation Corridor Equipment Pool Committee and will comply with the latest Environmental Protection Agency emission standards.

The new uniform standards will drive down costs and allow more manufacturers and suppliers to compete, fostering a healthy competition while re-establishing the U.S. domestic supply chain for passenger rail equipment.

The intent to purchase 35 new locomotives comes as intercity passenger rail ridership continues to post and exceed ridership records. Last year, Amtrak carried more than 31.2 million passengers, marking the highest annual ridership total since they started operations in 1971, and the ninth ridership record during the last 10 years.

The state corridor routes where these new locomotives will be deployed are among those services with the highest ridership growth.

Ad Loading...

Selection of the manufacturer will occur in early 2014. Delivery of the locomotives is planned for 2016. A copy of the RFP can be found here.

RELATED: "High-Speed Rail Reaches A Crossroads."

More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →