METRO Magazine Logo
MenuMENU
SearchSEARCH

HDR Tapped for California High Desert Corridor Rail Project

The proposed 54-mile corridor is designed to operate up to 180 miles per hour, creating a fast, high-capacity link between Los Angeles County’s Antelope Valley and the future Brightline West station in San Bernardino County.

June 24, 2025
HDR Tapped for California High Desert Corridor Rail Project

Once completed, the High Desert Corridor rail project will unlock new mobility options, providing access to jobs, housing, and cultural opportunities for communities with limited transportation options. 

Photo: METRO

2 min to read


The High Desert Corridor Joint Powers Agency selected HDR to lead engineering, design, and advisory services for a landmark intercity passenger rail line connecting Palmdale and Victorville, Calif.

The proposed 54-mile corridor is designed to operate up to 180 miles per hour, creating a fast, high-capacity link between Los Angeles County’s Antelope Valley and the future Brightline West station in San Bernardino County. This key east-west alignment will connect California’s planned high-speed rail system and regional and national networks, including eventual access to Las Vegas, Northern California, and beyond.

Ad Loading...

A Vision for Enhanced Mobility, Regional Growth

Once completed, the High Desert Corridor (HDC) rail project will unlock new mobility options, providing access to jobs, housing, and cultural opportunities for communities with limited transportation options. 

As a future multimodal hub, the Palmdale terminus is expected to connect with local transit, Metrolink, California High-Speed Rail, and ultimately Brightline West.

“The High Desert Corridor will improve connectivity and accessibility for millions of travelers, generate billions in economic activity, and open new opportunities for the whole region,” said Girair Kotchian, HDR’s project manager. “It’s a privilege to be involved with such a momentous project for Southern California.”

Scope of HDR’s Five-Year Contract

HDR’s selection follows the agency’s goal of assembling a multidisciplinary team with a proven track record in delivering complex, large-scale rail infrastructure. 

Under the five-year contract, HDR will lead a wide range of services, including:

Ad Loading...
  • Rail alignment and systems design.

  • Station and operations & maintenance (O&M) facility planning.

  • Environmental support and impact mitigation.

  • Bridge and civil infrastructure design.

  • Systems integration and corridor-wide planning.

  • Right-of-way coordination.

  • Stakeholder engagement and risk management.

  • Procurement support and contract administration.

“Delivering the engineering and advisory services associated with the High Desert Corridor requires a multidisciplinary team that can maximize a broad array of opportunities and tackle diverse challenges with resilience, technical expertise, and unwavering focus,” said Matt Tucker, HDR’s global transit director. “We have an exceptional team gathered with world-class expertise in large-scale transit corridors. This is great news for Southern California and the future of high-speed rail in the United States.”

Timeline and Next Steps

The HDC project is currently in the preliminary engineering and environmental documentation phase. 

Construction is expected to begin in the early 2030s, positioning the corridor as a vital component in expanding the state’s high-speed and intercity rail infrastructure.

The partnership between the High Desert Corridor Joint Powers Agency and HDR marks a pivotal milestone for rail development in the West. It sets the stage for transformative transportation solutions that will reshape regional connectivity for decades to come.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →