METRO Magazine Logo
MenuMENU
SearchSEARCH

HDR Tapped for California High Desert Corridor Rail Project

The proposed 54-mile corridor is designed to operate up to 180 miles per hour, creating a fast, high-capacity link between Los Angeles County’s Antelope Valley and the future Brightline West station in San Bernardino County.

June 24, 2025
HDR Tapped for California High Desert Corridor Rail Project

Once completed, the High Desert Corridor rail project will unlock new mobility options, providing access to jobs, housing, and cultural opportunities for communities with limited transportation options. 

Photo: METRO

2 min to read


The High Desert Corridor Joint Powers Agency selected HDR to lead engineering, design, and advisory services for a landmark intercity passenger rail line connecting Palmdale and Victorville, Calif.

The proposed 54-mile corridor is designed to operate up to 180 miles per hour, creating a fast, high-capacity link between Los Angeles County’s Antelope Valley and the future Brightline West station in San Bernardino County. This key east-west alignment will connect California’s planned high-speed rail system and regional and national networks, including eventual access to Las Vegas, Northern California, and beyond.

Ad Loading...

A Vision for Enhanced Mobility, Regional Growth

Once completed, the High Desert Corridor (HDC) rail project will unlock new mobility options, providing access to jobs, housing, and cultural opportunities for communities with limited transportation options. 

As a future multimodal hub, the Palmdale terminus is expected to connect with local transit, Metrolink, California High-Speed Rail, and ultimately Brightline West.

“The High Desert Corridor will improve connectivity and accessibility for millions of travelers, generate billions in economic activity, and open new opportunities for the whole region,” said Girair Kotchian, HDR’s project manager. “It’s a privilege to be involved with such a momentous project for Southern California.”

Scope of HDR’s Five-Year Contract

HDR’s selection follows the agency’s goal of assembling a multidisciplinary team with a proven track record in delivering complex, large-scale rail infrastructure. 

Under the five-year contract, HDR will lead a wide range of services, including:

Ad Loading...
  • Rail alignment and systems design.

  • Station and operations & maintenance (O&M) facility planning.

  • Environmental support and impact mitigation.

  • Bridge and civil infrastructure design.

  • Systems integration and corridor-wide planning.

  • Right-of-way coordination.

  • Stakeholder engagement and risk management.

  • Procurement support and contract administration.

“Delivering the engineering and advisory services associated with the High Desert Corridor requires a multidisciplinary team that can maximize a broad array of opportunities and tackle diverse challenges with resilience, technical expertise, and unwavering focus,” said Matt Tucker, HDR’s global transit director. “We have an exceptional team gathered with world-class expertise in large-scale transit corridors. This is great news for Southern California and the future of high-speed rail in the United States.”

Timeline and Next Steps

The HDC project is currently in the preliminary engineering and environmental documentation phase. 

Construction is expected to begin in the early 2030s, positioning the corridor as a vital component in expanding the state’s high-speed and intercity rail infrastructure.

The partnership between the High Desert Corridor Joint Powers Agency and HDR marks a pivotal milestone for rail development in the West. It sets the stage for transformative transportation solutions that will reshape regional connectivity for decades to come.

More Rail

Coastal railroad tracks run between a steep bluff and the Pacific Ocean in San Clemente, California, with rock barriers protecting portions of the shoreline.
Rail•by Elora Haynes•October 1, 2026

OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion

The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.

Read More →
DRPA interns with program swag.
Management•by Alex Roman•October 1, 2026

More Than a Summer Job: Building the Next Generation of Transit Talent

The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.

Read More →
An Amtrak Airo trainset on the Cascades line
Rail•by Alex Roman•September 30, 2026

Airo Trains Make Their Amtrak Cascades Debut in the Pacific Northwest

Effective immediately, two cutting-edge Airo trainsets will join the Amtrak Cascades route, operating four daily trips between Vancouver, B.C., Seattle, Portland, and Eugene, Oregon, marking the first introduction of Airo trains into passenger service anywhere in the country.

Read More →
Ad Loading...
Rail•by Alex Roman•September 29, 2026

Florida's Brightline Announces Financial Restructuring

Brightline Florida says train operations will continue as normal as certain parent entities enter Chapter 11 and financial stakeholders provide $490 million in new long-term capital.

Read More →
Bus manufacturing image from ENC
Technology•by Alex Roman•September 25, 2026

ENC Lands MATA Contract and More in Biz Briefs

In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.

Read More →
Turning transit data into better decisions
Management•by Alex Roman•September 23, 2026

Strada360’s Steve Lassey on Turning Transit Data Into Better Decisions

From breaking down data silos to preparing for AI, Strada360 CEO Steve Lassey discusses how transit agencies can use technology to improve operations, customer information, and long-term decision-making.

Read More →
Ad Loading...
SEPTA Accelerate press conference
Management•by Staff and News Reports•September 23, 2026

SEPTA Details Accelerate Vision for Transit System

The plan outlines investments in trolley modernization, new Metro and Regional Rail vehicles, accessible stations, and more frequent bus and rail service.

Read More →
Two MBTA railcars in station.

FTA Ends Direct Oversight of MBTA Safety Actions

The federal agency closed its remaining special directive to the Massachusetts Department of Public Utilities following a safety review that began in 2022.

Read More →
A photo of an Amtrak train with a logo
Rail•by Staff and News Reports•September 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
Ad Loading...
A New York MTA subway car with an open gangway
Rail•by Staff and News Reports•September 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →