METRO Magazine Logo
MenuMENU
SearchSEARCH

High-speed projects receive funds

California’s grant will go toward the initial construction set to begin next year in Fresno. Meanwhile, Michigan's funds will go toward improvements that will allow for speeds up to 110 mph on 77% of Amtrak’s Wolverine and Blue Water services between Detroit and Chicago.

November 22, 2011
2 min to read


The California High-Speed Rail Authority and the Michigan Department of Transportation (MDOT) received $928.6 million and $150 million, respectively, in federal funding for high-speed rail projects in their areas.

California's grant will go toward the initial construction set to begin next year in Fresno. When combined with voter-approved state support and previously-awarded federal dollars, the funds will go toward the construction of the first usable segment of the California system in the Central Valley.

Ad Loading...

In the recently released business plan, the authority embraced a phased implementation similar to those used for international systems. The first construction project will put more than 100,000 people to work during the next five years. Over the course of the network's construction, more than one million jobs are expected to be created, and the economic activity spurred by the new system is expected to add up to 450,000 new non-high-speed rail jobs to the California economy by 2040.

The funds awarded to Michigan will go toward increasing the safety and reliability of Amtrak's Wolverine and Blue Water services between Detroit and Chicago and put more than 800 Americans back to work this spring.

The grant will enable MDOT to acquire ownership over much of the Chicago-Detroit/Pontiac High Speed Rail Corridor within the State of Michigan and pave the way for them to begin a track and signal improvement project between Detroit and Kalamazoo, Mich., in the spring of 2012.

The improvements will allow for speeds up to 110 mph on 77% of Amtrak's Wolverine and Blue Water services between Detroit and Chicago, resulting in a 30 minute reduction in travel times between those destinations.

Previously announced FRA investments in the line include new continuously welded rail and ties, fiber optic lines and infrastructure to support a positive train control system, rebuilding 180 highway-rail grade crossings and gates and flashers at 65 private highway-rail grade crossings.

Ad Loading...

The corridor will also benefit from next-generation American-made trains, funded as part of a previously announced $782 million grant that will pump new life into domestic manufacturing. States will purchase 33 quick-acceleration locomotives and 120 bi-level passenger cars to operate in Illinois, Indiana, Michigan, Iowa, Missouri, California, Washington and Oregon.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →