METRO Magazine Logo
MenuMENU
SearchSEARCH

Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement

The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

September 23, 2024
Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.

Photo: MBTA

 

3 min to read


The Healey-Driscoll Administration, the Massachusetts Congressional delegation, and Boston Mayor Michelle Wu are celebrating that Massachusetts has been awarded nearly half a billion dollars from the U.S. Department of Transportation to replace the North Station Draw One Bridge.

The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

Ad Loading...

MBTA’s Huge Fed Funding

The $472,300,616 awarded to the MBTA came from the National Infrastructure Project Assistance program (MEGA) as part of the Multimodal Project Discretionary Grant program. This is the largest federal award the MBTA has won to date.

“We know that improving our transportation infrastructure is critical for improving quality of life and making sure Massachusetts remains the best place to live, work, raise a family and build a future,” said Gov. Maura Healey. “That’s why our administration is competing so aggressively to win federal funding that can be put toward our roads, bridges, and public transportation.”

Draw One Drawbridge

Draw One is a Depression-era drawbridge that spans the Charles River and connects the Cities of Boston and Cambridge.

The bridge carries the MBTA Commuter Rail and Amtrak trains, serving approximately 11,250,000 passengers per year.

The MBTA lines that utilize the bridge are the Haverhill, Lowell, Newburyport/Rockport, and Fitchburg Commuter Rail lines.

Ad Loading...

Project features include the replacement and modernization of the existing drawbridge, replacement of a control tower, extension of the bridge platform, connection of tracks 11 and 12 to the existing network, station improvements, and upgrades to track, signal, communications, and infrastructure.

The project will also support more than 14,500 jobs, make the bridge more climate resilient by bringing it above project sea-level rise, and lower emissions.

“This award continues to demonstrate our aggressive approach to pursuing all funding opportunities under the lead of the Healey-Driscoll Administration as we pursue every available federal grant,” said MBTA GM Phillip Eng. “Our Grants and North Station Drawbridge teams deserve all the credit for their exceptional work to secure this funding which allows us to ensure the efficient and reliable movement of all North Station train lines while greatly improving our ability to provide more frequent, regional rail-style service across the entire northside corridor to serve future generations to come.”

The Quest for Federal Funding

The Healey-Driscoll Administration has prioritized aggressively competing for federal funding.

Since Gov. Healey took office, the state has pulled in almost $8 billion in federal funding, including over $4 billion allotted by formula and more than $3.5 billion in discretionary grant awards.

Ad Loading...

The funds have successfully supported projects across the state related to transportation, climate resiliency, job creation, and economic development.

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.

Recent awards include $67.6 million to advance accessibility at MBTA Green Line stations, nearly $40 million in support of the Battery-Electric Bus Transition Phase 1B Project to replace the diesel-fueled buses at the Quincy Bus Maintenance Facility with state-of-the-art battery-electric buses (BEBs), $22 million to construct hybrid center-running bus lanes and make bike and pedestrian improvements through the Lower Broadway Everett Transit Priority Corridor Project, $3.8 million in transit security funds, $2.1 million to pilot technology upgrades on 175 buses to assist with “blind spot” challenges, and $1.2 million to advance the Alewife Station and Garage Technical Assistance Program.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →