METRO Magazine Logo
MenuMENU
SearchSEARCH

Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement

The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

September 23, 2024
Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.

Photo: MBTA

 

3 min to read


The Healey-Driscoll Administration, the Massachusetts Congressional delegation, and Boston Mayor Michelle Wu are celebrating that Massachusetts has been awarded nearly half a billion dollars from the U.S. Department of Transportation to replace the North Station Draw One Bridge.

The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

Ad Loading...

MBTA’s Huge Fed Funding

The $472,300,616 awarded to the MBTA came from the National Infrastructure Project Assistance program (MEGA) as part of the Multimodal Project Discretionary Grant program. This is the largest federal award the MBTA has won to date.

“We know that improving our transportation infrastructure is critical for improving quality of life and making sure Massachusetts remains the best place to live, work, raise a family and build a future,” said Gov. Maura Healey. “That’s why our administration is competing so aggressively to win federal funding that can be put toward our roads, bridges, and public transportation.”

Draw One Drawbridge

Draw One is a Depression-era drawbridge that spans the Charles River and connects the Cities of Boston and Cambridge.

The bridge carries the MBTA Commuter Rail and Amtrak trains, serving approximately 11,250,000 passengers per year.

The MBTA lines that utilize the bridge are the Haverhill, Lowell, Newburyport/Rockport, and Fitchburg Commuter Rail lines.

Ad Loading...

Project features include the replacement and modernization of the existing drawbridge, replacement of a control tower, extension of the bridge platform, connection of tracks 11 and 12 to the existing network, station improvements, and upgrades to track, signal, communications, and infrastructure.

The project will also support more than 14,500 jobs, make the bridge more climate resilient by bringing it above project sea-level rise, and lower emissions.

“This award continues to demonstrate our aggressive approach to pursuing all funding opportunities under the lead of the Healey-Driscoll Administration as we pursue every available federal grant,” said MBTA GM Phillip Eng. “Our Grants and North Station Drawbridge teams deserve all the credit for their exceptional work to secure this funding which allows us to ensure the efficient and reliable movement of all North Station train lines while greatly improving our ability to provide more frequent, regional rail-style service across the entire northside corridor to serve future generations to come.”

The Quest for Federal Funding

The Healey-Driscoll Administration has prioritized aggressively competing for federal funding.

Since Gov. Healey took office, the state has pulled in almost $8 billion in federal funding, including over $4 billion allotted by formula and more than $3.5 billion in discretionary grant awards.

Ad Loading...

The funds have successfully supported projects across the state related to transportation, climate resiliency, job creation, and economic development.

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.

Recent awards include $67.6 million to advance accessibility at MBTA Green Line stations, nearly $40 million in support of the Battery-Electric Bus Transition Phase 1B Project to replace the diesel-fueled buses at the Quincy Bus Maintenance Facility with state-of-the-art battery-electric buses (BEBs), $22 million to construct hybrid center-running bus lanes and make bike and pedestrian improvements through the Lower Broadway Everett Transit Priority Corridor Project, $3.8 million in transit security funds, $2.1 million to pilot technology upgrades on 175 buses to assist with “blind spot” challenges, and $1.2 million to advance the Alewife Station and Garage Technical Assistance Program.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →