Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement
The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.
Photo: MBTA
The Healey-Driscoll Administration, the Massachusetts Congressional delegation, and Boston Mayor Michelle Wu are celebrating that Massachusetts has been awarded nearly half a billion dollars from the U.S. Department of Transportation to replace the North Station Draw One Bridge.
The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.
MBTA’s Huge Fed Funding
The $472,300,616 awarded to the MBTA came from the National Infrastructure Project Assistance program (MEGA) as part of the Multimodal Project Discretionary Grant program. This is the largest federal award the MBTA has won to date.
“We know that improving our transportation infrastructure is critical for improving quality of life and making sure Massachusetts remains the best place to live, work, raise a family and build a future,” said Gov. Maura Healey. “That’s why our administration is competing so aggressively to win federal funding that can be put toward our roads, bridges, and public transportation.”
Draw One Drawbridge
Draw One is a Depression-era drawbridge that spans the Charles River and connects the Cities of Boston and Cambridge.
The bridge carries the MBTA Commuter Rail and Amtrak trains, serving approximately 11,250,000 passengers per year.
The MBTA lines that utilize the bridge are the Haverhill, Lowell, Newburyport/Rockport, and Fitchburg Commuter Rail lines.
Project features include the replacement and modernization of the existing drawbridge, replacement of a control tower, extension of the bridge platform, connection of tracks 11 and 12 to the existing network, station improvements, and upgrades to track, signal, communications, and infrastructure.
The project will also support more than 14,500 jobs, make the bridge more climate resilient by bringing it above project sea-level rise, and lower emissions.
“This award continues to demonstrate our aggressive approach to pursuing all funding opportunities under the lead of the Healey-Driscoll Administration as we pursue every available federal grant,” said MBTA GM Phillip Eng. “Our Grants and North Station Drawbridge teams deserve all the credit for their exceptional work to secure this funding which allows us to ensure the efficient and reliable movement of all North Station train lines while greatly improving our ability to provide more frequent, regional rail-style service across the entire northside corridor to serve future generations to come.”
The Quest for Federal Funding
The Healey-Driscoll Administration has prioritized aggressively competing for federal funding.
Since Gov. Healey took office, the state has pulled in almost $8 billion in federal funding, including over $4 billion allotted by formula and more than $3.5 billion in discretionary grant awards.
The funds have successfully supported projects across the state related to transportation, climate resiliency, job creation, and economic development.
This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.
Recent awards include $67.6 million to advance accessibility at MBTA Green Line stations, nearly $40 million in support of the Battery-Electric Bus Transition Phase 1B Project to replace the diesel-fueled buses at the Quincy Bus Maintenance Facility with state-of-the-art battery-electric buses (BEBs), $22 million to construct hybrid center-running bus lanes and make bike and pedestrian improvements through the Lower Broadway Everett Transit Priority Corridor Project, $3.8 million in transit security funds, $2.1 million to pilot technology upgrades on 175 buses to assist with “blind spot” challenges, and $1.2 million to advance the Alewife Station and Garage Technical Assistance Program.
More Rail

New York MTA Leverages Zoning Program to Advance Station Accessibility
Accessibility enhancements at Nevins St Station will be financed through a development agreement tied to the MTA's Zoning for Accessibility initiative.
Read More →
Virginia's $28.5B Transportation Plan Targets Transit and Rail
Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.
Read More →
DOT: Brightline Corridor Incidents Fall 30% Following Federal Safety Upgrades
Safety improvements funded through a $25 million federal investment are credited with reducing trespassing and train-vehicle collisions along the Brightline Florida corridor.
Read More →
D Line Expansion Fuels Growth Across LA Metro's Rail System
Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.
Read More →
Southern California's Metrolink Debuts Contactless Fare Payment Pilot
Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.
Read More →
California's BART Approves FY27 Budget While Maintaining Service Levels
The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.
Read More →
Penn Station Transformation Advances with Design Unveiling
The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.
Read More →
Second Avenue Subway Phase 2 Advances into Major Construction Stage
New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.
Read More →
The Invisible Infrastructure of Passenger Flow
What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.
Read More →
Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures
The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.
Read More →