METRO Magazine Logo
MenuMENU
SearchSEARCH

Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement

The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

September 23, 2024
Massachusetts Wins $472M Federal Grant for Draw One Bridge Replacement

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.

Photo: MBTA

 

3 min to read


The Healey-Driscoll Administration, the Massachusetts Congressional delegation, and Boston Mayor Michelle Wu are celebrating that Massachusetts has been awarded nearly half a billion dollars from the U.S. Department of Transportation to replace the North Station Draw One Bridge.

The project will allow for more train capacity, faster and more reliable rides, and increased safety on MBTA commuter rail and Amtrak trains.

Ad Loading...

MBTA’s Huge Fed Funding

The $472,300,616 awarded to the MBTA came from the National Infrastructure Project Assistance program (MEGA) as part of the Multimodal Project Discretionary Grant program. This is the largest federal award the MBTA has won to date.

“We know that improving our transportation infrastructure is critical for improving quality of life and making sure Massachusetts remains the best place to live, work, raise a family and build a future,” said Gov. Maura Healey. “That’s why our administration is competing so aggressively to win federal funding that can be put toward our roads, bridges, and public transportation.”

Draw One Drawbridge

Draw One is a Depression-era drawbridge that spans the Charles River and connects the Cities of Boston and Cambridge.

The bridge carries the MBTA Commuter Rail and Amtrak trains, serving approximately 11,250,000 passengers per year.

The MBTA lines that utilize the bridge are the Haverhill, Lowell, Newburyport/Rockport, and Fitchburg Commuter Rail lines.

Ad Loading...

Project features include the replacement and modernization of the existing drawbridge, replacement of a control tower, extension of the bridge platform, connection of tracks 11 and 12 to the existing network, station improvements, and upgrades to track, signal, communications, and infrastructure.

The project will also support more than 14,500 jobs, make the bridge more climate resilient by bringing it above project sea-level rise, and lower emissions.

“This award continues to demonstrate our aggressive approach to pursuing all funding opportunities under the lead of the Healey-Driscoll Administration as we pursue every available federal grant,” said MBTA GM Phillip Eng. “Our Grants and North Station Drawbridge teams deserve all the credit for their exceptional work to secure this funding which allows us to ensure the efficient and reliable movement of all North Station train lines while greatly improving our ability to provide more frequent, regional rail-style service across the entire northside corridor to serve future generations to come.”

The Quest for Federal Funding

The Healey-Driscoll Administration has prioritized aggressively competing for federal funding.

Since Gov. Healey took office, the state has pulled in almost $8 billion in federal funding, including over $4 billion allotted by formula and more than $3.5 billion in discretionary grant awards.

Ad Loading...

The funds have successfully supported projects across the state related to transportation, climate resiliency, job creation, and economic development.

This is the latest in a string of federal grants awarded to the MBTA, which has successfully secured an award from every grant program it has applied for since the beginning of the year, signaling a growth in confidence in its ability to efficiently deliver productive results.

Recent awards include $67.6 million to advance accessibility at MBTA Green Line stations, nearly $40 million in support of the Battery-Electric Bus Transition Phase 1B Project to replace the diesel-fueled buses at the Quincy Bus Maintenance Facility with state-of-the-art battery-electric buses (BEBs), $22 million to construct hybrid center-running bus lanes and make bike and pedestrian improvements through the Lower Broadway Everett Transit Priority Corridor Project, $3.8 million in transit security funds, $2.1 million to pilot technology upgrades on 175 buses to assist with “blind spot” challenges, and $1.2 million to advance the Alewife Station and Garage Technical Assistance Program.

More Rail

Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Ad Loading...
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
Ad Loading...
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
Ad Loading...
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →