METRO Magazine Logo
MenuMENU
SearchSEARCH

MBTA employees to use 'biometric' time clock at rail facility

This new system, which has been in the works for more than a year, will enable employees to clock in and out by swiping their finger and tapping in a personalized PIN number.

December 7, 2016
MBTA employees to use 'biometric' time clock at rail facility

Photo: Keolis

2 min to read


Photo: Keolis

Keolis Commuter Services launched a new, technologically advanced time clock system that uses biometric scanning to improve the accuracy and ease of timekeeping processes at all Keolis mechanical facilities.

This new system, which has been in the works for more than a year, will enable employees to clock in and out by swiping their finger and tapping in a personalized PIN number, replacing the current badge system.

A biometric scan is a read of certain features of a specific finger. The system utilizes an algorithm to validate the identity of the employee in conjunction with their unique numerical PIN.

Ad Loading...

The new technology was rolled out December 2 at the MBTA Commuter Rail Maintenance Facility (often known by its former name of Boston Engine Terminal, or BET), the primary train maintenance repair facility for the MBTA Commuter Rail system. It also serves as a layover/storage site for trains that operate in and out of North Station. Registration for the new time clock system began on Monday, Dec. 5th at the BET, along with the Readville Repair Facility, and the Southampton Street Yard at Widett Circle, which services trains running in and out of South Station. The new system goes into effect on Dec. 16 for approximately 550 Keolis mechanical employees.

“This new program, widely used by many businesses around the world, will enable Keolis to bring a modern approach to tracking time and attendance, freeing our staff to focus their time getting locomotives and coaches back into service more quickly to ensure our passengers get where they need to go,” said Ernest Piper, Acting Chief Mechanical Officer at Keolis Commuter Services.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →