METRO Magazine Logo
MenuMENU
SearchSEARCH

Metro-North rail due for upgrade

The job was advertised Friday and a construction contract will be awarded this fall for the replacement of all the original cables that lift the two, 330-foot-long main spans of the Harlem River Lift Bridge, located about 4.5 miles north of Grand Central.

October 10, 2012
2 min to read


A crucial bridge providing the only access into Manhattan for all Metro-North trains traveling to and from Grand Central Terminal is due for a major upgrade, the railroad announced.

The job was advertised Friday and a construction contract will be awarded this fall for the replacement of all the original cables that lift the two, 330-foot-long main spans of the Harlem River Lift Bridge, located about 4.5 miles north of Grand Central.

Ad Loading...

“Metro-North must maintain this crucial piece of infrastructure so that it can be used by both train customers and maritime traffic. It is vital to the more than 280,000 Metro-North customers and 750 trains that use it each weekday,” said Metro-North President Howard Permut.

The work has been scheduled to do the job in the most efficient way possible to take full advantage of a six-month Coast Guard outage, during which time the bridge will not have to be opened on demand. While the cable replacement is underway, the railroad also will replace the electrical control system and most of the wiring on the bridge as well as install a new power supply system.

All the original circuit boards in the control room also will be computerized with the installation of a programmable logic control system. The elevator from the track level up to the operator’s room at the counterweight level also will be rehabilitated.

The entire two-year project, which is expected to cost $30 million, is being paid for by the Metropolitan Transportation Authority’s 2010-2014 Capital Program with help from a federal grant of $19 million.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →