METRO Magazine Logo
MenuMENU
SearchSEARCH

NJ TRANSIT Issues RFQ for New Northern Rail Maintenance Facility

The agency invites design-build teams to prequalify for a major infrastructure investment in Clifton, New Jersey.

NJ TRANSIT rail station platform.

NJ TRANSIT releases RFQ for a new Northern Rail MOW facility in Clifton, replacing the aging, flood-prone Wood-Ridge site.

Photo: NJ TRANSIT

2 min to read


NJ TRANSIT has released a Request for Qualifications (RFQ) for Special Prequalification for the final design, construction, and commissioning of the Northern Rail Maintenance-of-Way (MOW) facility, a major infrastructure initiative in Clifton, N.J.

The new facility will replace the aging and flood-prone Wood-Ridge location, creating a more resilient and modernized base of operations to support NJ TRANSIT’s growing maintenance and repair needs.

Ad Loading...

“This facility will provide more efficient maintenance and more dependable service by ensuring our track repair equipment remains in a state of good repair,” said NJ TRANSIT President and CEO Kris Kolluri. “With this RFQ, we’re advancing a project that directly supports the long-term reliability and safety of our rail network.”

NJ TRANSIT Details Plans for Modern Rail Maintenance Site

According to an agency release, the new Clifton location will enhance NJ TRANSIT’s ability to maintain the right-of-way and railroad infrastructure by providing modernized space for maintenance, servicing, and repair of vehicles.

The design will enhance the current functions performed at the existing facility, accommodate increased maintenance demands, and incorporate updated features that meet current codes and operational needs

The project includes:

  • Demolition and environmental abatement of an existing building and substructures at 99 Kuller Road.

  • Construction of three new buildings across two NJ TRANSIT-owned sites.

  • Site grading, new access roads, and dedicated parking areas.

  • Coordinate site utilities and integrate maintenance equipment.

Ad Loading...

The Special Prequalification process will evaluate design-build teams based on their technical qualifications, relevant experience, and project approach. Following the evaluation, NJ TRANSIT anticipates shortlisting the most qualified firms to move forward to the next phase. At that point, a formal Request for Proposal (RFP) will be issued. 

More Management

Two MBTA railcars in station.

FTA Ends Direct Oversight of MBTA Safety Actions

The federal agency closed its remaining special directive to the Massachusetts Department of Public Utilities following a safety review that began in 2022.

Read More →
A WMATA bus at a transit center
Busby Alex RomanSeptember 21, 2026

Report: Transit Bus Manufacturing Supports 34,100 Jobs, $5.1B in GDP

The “Buses Mean Business” report examines the transit bus manufacturing industry’s economic footprint, supply chain, and rising demand for vehicle replacements.

Read More →
LIT 10-Year Anniversary Graphic
Managementby Alex RomanSeptember 17, 2026

LIT Marks 10-Year Milestone at Annual Summit

Hosted by the COTA from September 10 to 13, the Summit carried the theme “Celebrating 10 Years of Excellence, Leadership, and Impact,” with every part of the program honoring the people, agencies, and partners who built LIT over its first decade.

Read More →
Ad Loading...
Third Generation Joins Dan Dipert Coaches Leadership Team
Managementby Alex RomanSeptember 17, 2026

People Movement: Dan Dipert Coaches Adds Third-Generation Leader, Keolis Names New Valley Metro VP/GM, and More

In this edition, we also cover recent appointments and announcements at the Wabtec, SilverRide, HNTB, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
AAAHI receiving METRO's Innovative Operator of the Year Award
Motorcoachby Alex RomanSeptember 16, 2026

METRO Opens Submissions for 2026 Motorcoach Awards

Nominations are now being accepted for METRO Magazine’s Operator of the Year and Innovative Operator of the Year awards.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
Ad Loading...
Transit Leaders Gather for National Safety Summit
Security and Safetyby Alex RomanSeptember 16, 2026

Transit Agencies Highlight Safety Gains at National Summit

Leaders from 15 major transit systems shared crime-reduction results and safety initiatives while discussing the role of continued federal support.

Read More →
A blue and white graphic with text reading "NITA Names New Leadership, Expands Reduced-Fare Program."
Managementby Staff and News ReportsSeptember 14, 2026

NITA Names New Leadership, Expands Reduced-Fare Program at First Board Meeting

The new regional transit authority appointed its first board chair and interim executive director while extending reduced fares across CTA, Metra, and Pace for eligible riders.

Read More →
From Checklists to Better Outcomes
TechnologySeptember 11, 2026

Beyond the Checklist: A Structured Approach to Transit Maintenance

Reliability-Centered Maintenance helps transit agencies move beyond routine checklists to focus limited resources on the assets and failures that have the greatest impact on safety, reliability, and service.

Read More →
Ad Loading...
A red, white, and blue graphic with the APTA logo and text reading "APTA Nominates 2026-2027 Chair & Vice Chair."
Managementby Staff and News ReportsSeptember 10, 2026

APTA 2026 Nominating Committee Selects Leadership Slate, Names Chair and Vice Chair Nominees

Leadership changes will help shape the association’s priorities and its representation of the transportation industry during the 2026–2027 term.

Read More →