METRO Magazine Logo
MenuMENU
SearchSEARCH

Proterra receives Raleigh-Durham Airport order

This purchase marks the company’s first airport customer and the first airport electric bus deployment in the Carolinas.

August 18, 2017
Proterra receives Raleigh-Durham Airport order

The new Proterra battery-electric buses will replace four older diesel buses, resulting in the elimination 16.9 million pounds of greenhouse gases over the lifetime of these vehicles.

2 min to read


The new Proterra battery-electric buses will replace four older diesel buses, resulting in the elimination 16.9 million pounds of greenhouse gases over the lifetime of these vehicles.

Proterra announced that the Raleigh-Durham Airport (RDU) Authority approved the purchase of four Proterra Catalyst E2 zero-emissions battery-electric transit buses and related charging infrastructure. RDU selected Proterra as its battery-electric bus provider citing the company’s sustainability, performance and operational cost-savings excellence. This purchase marks Proterra’s first airport customer and the first airport electric bus deployment in the Carolinas.

Currently, RDU shuttle buses transport on average 112,166 passengers and luggage per month between the airport’s two ParkRDU Economy lots and terminals with a diesel-powered fleet consisting of 14, 40-foot transit buses that are replaced every seven to 10 years. Funded in part by a $1.6 million zero-emissions vehicle grant from the Federal Aviation Administration, the new Proterra battery-electric buses will replace four older diesel buses, resulting in the elimination 16.9 million pounds of greenhouse gases over the lifetime of these vehicles.

Ad Loading...

Since the Proterra buses have no combustion engine, riders will enjoy a smoother, exhaust-free ride, experiencing less noise as the bus travels between the terminal and parking lot shuttle stops. In addition to traveler benefits, the operational cost of electricity, at $.19/mile, is substantially lower than diesel, at $.84/mile, according to Proterra. Combining this with greatly improved vehicle efficiency, at 21 MPG equivalent, and reduced vehicle maintenance costs will result in a savings of about $1.8 million during the 12-year lifetime of these new Proterra buses.

Scheduled to be placed in service in early 2019, the buses will be designed and built at Proterra’s Greenville, S.C. manufacturing facility.


More Bus

Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
Ad Loading...
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
Ad Loading...
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →
David Carol, Baker Alloush, and Jesse Lazarus from METRO's People Movement February 4 edition.
Managementby Staff and News ReportsFebruary 4, 2026

New Rolling Stock Strategy Lead at New York MTA and More in People Movement

In this edition, we cover recent appointments and announcements at HDR, NCTD, STV, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →