The S700 low-floor light rail vehicles will have low-level boarding at every doorway, a spacious seating design, and larger windows for better light and views.
Siemens
1 min to read
The S700 low-floor light rail vehicles will have low-level boarding at every doorway, a spacious seating design, and larger windows for better light and views. Siemens
Calif.’s Sacramento Regional Transit (SacRT) awarded a contract to Siemens Mobility for 20 new light rail vehicles (LRVs). This is the first new order from Sacramento since the late 1980s, when SacRT ordered 36 U2A vehicles from Siemens Mobility.
Ad Loading...
The contract, including the 20 trains, spare parts, and tools is approximately $100 million.
The S700 low-floor light rail vehicles will have low-level boarding at every doorway, a spacious seating design, and larger windows for better light and views. They will feature improved accessibility with wider aisles, built-in storage space for luggage, and areas for bicycles. In addition, the vehicles will have improved performance and optimized availability provided by condition monitoring, remote diagnostics, and predictive maintenance.
The Siemens Mobility Sacramento plant manufactures the full range of vehicles from light rail and trams, to locomotives and passenger coaches. It is a full-scale modern manufacturing plant powered almost entirely by a two-megawatt solar installation.
The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.
The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.
In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.
This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.
Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.