METRO Magazine Logo
MenuMENU
SearchSEARCH

WSP USA projects recognized with three Calif. transportation awards

The Exposition Line Light Rail in Los Angeles received the California Transportation Foundation's Overall Project of the Year award.

September 20, 2017
WSP USA projects recognized with three Calif. transportation awards

The Exposition Line Light Rail in Los Angeles, designed by WSP USA, received the California Transportation Foundation’s Overall Project of the Year award. Photo: L.A. Metro

2 min to read


The Exposition Line Light Rail in Los Angeles, designed by WSP USA, received the California Transportation Foundation’s Overall Project of the Year award. Photo: L.A. Metro

WSP USA, formerly WSP | Parsons Brinckerhoff, made significant contributions on three projects which recently received awards from the California Transportation Foundation (CTF).The Exposition Line Light Rail in Los Angeles received CTF’s Overall Project of the Year award. WSP was recognized for its design of the light rail extension.

The Expo Line Phase 2 extension features 6.6 miles of new light rail and seven new stations from Culver City to Santa Monica, extending the Metro Expo Line to 15.2 miles. When the Expo Line Phase 2 extension opened in May 2016, it heralded a new era of rail service to the Pacific Ocean that hasn’t been available since the closing of Pacific Electric Streetcar’s Santa Monica Air Line in 1953.

Ad Loading...

The I-80/Yerba Buena Island Westbound Ramps Improvement Project received the CTF’s Interchange Project of the Year award. WSP was recognized for its construction management services.

The I-80/Yerba Buena project is the initial step to prepare for the increased traffic that will come with the redevelopment of Treasure Island and Yerba Buena Island, located in the city and county of San Francisco. With the opening of the completed ramps, much-needed safety and operations improvements were made by replacing the westbound on-ramps and off-ramps. In total, the project consisted of five new bridge structures, three of which were bridge widenings. A total of seven frames and five hinges were constructed. The new bridge structures were over 150 feet above grade, built over steep terrain. The design and construction of the falsework system presented significant challenges for the project team.  

The Safety Project of the Year award was given to the Nogales Street Grade Separation, for which WSP provided construction management services. The Nogales Street at-grade railroad crossing in Los Angeles County was recently ranked as the most dangerous rail intersection in California and the third most dangerous in the U.S. A new six-lane roadway underpass and double-track railway bridge now provides a complete grade separation between Nogales Street and the Union Pacific Railroad crossing, eliminating the potential for collisions of motorists and trains and reducing noise caused by the locomotive trains.

The CTF Transportation Awards recognize excellence in California transportation, in all modes, across the public and private sectors, and from all regions of the state.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →