RELATED: NCTD rail to use confidential close call reporting system
NTSB to railroads: Finish the job implementing Positive Train Control
Press event coincided with the 50th anniversary of a train collision in Darien, Conn., that killed four people and injured 43 others.

NTSB Member Jennifer Homendy with Connecticut Senator Richard Blumenthal at a press event.
NTSB photo by Peter Knudson

NTSB Member Jennifer Homendy with Connecticut Senator Richard Blumenthal at a press event.
NTSB photo by Peter Knudson
National Transportation Safety Board Member Jennifer Homendy called on U.S. railroads Tuesday to fully implement Positive Train Control (PTC).
At a press event in New Haven, Conn., with Senator Richard Blumenthal and rail advocates, Homendy pushed for railroads to fully implement PTC, a safety system designed to prevent train-to-train collisions, overspeed derailments, switches left in the wrong position, and incursions into established work zone limits.
“In the past half century, the NTSB has investigated more than 150 PTC preventable accidents that have taken nearly 300 lives and injured about 6,700 others,” Homendy said. “The NTSB’s message is simple: no more extensions, no more excuses, and no more delays. Finish the job.”
The press event coincided with the 50th anniversary of a train collision in Darien, Conn., that killed four people and injured 43 others. The NTSB issued its first recommendation related to PTC as a result of its investigation of the Darien accident.
In 2008 Congress mandated the installation of PTC. The initial deadline for PTC was December 2015. That deadline was extended to 2018. With additional conditions met, some railroads now have until 2020 to fully implement PTC. The NTSB has asked that no further extensions be granted, which is why fully implementing PTC is on the NTSB 2019-2020 Most Wanted List of Transportation Safety Improvements.
Many railroads have made significant progress and have spent billions of dollars to implement PTC, improving the safety of many tracks and trains. Although the vast majority of railroads have completed work to install PTC on their track and locomotives, only 16% of Class I railroads, 19% of intercity passenger railroads, and 29% of commuter railroads report that they have made their PTC system interoperable with other systems.
Passenger trains frequently operate on track owned by other railroads, which is why interoperability is required for a fully operational PTC system.
“Today is about remembering Darien,” said Homendy. “And there’s no better way to put that memory into action than to complete the implementation of PTC.”
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →