Loading data...
The MicroLok II VitalNet CPU, a Positive Train Control (PTC) central processing unit, provides Vital PTC compatibility that enables Ansaldo STS USA's customers to leverage existing and new MicroLok II wayside signaling investments in concert with PTC implementation. An existing MicroLok II CPU board is easily exchanged with a VitalNet CPU board, providing a PTC-ready interface.
Read More →This week, U.S. Transportation Secretary Ray LaHood and Federal Railroad Administrator Joseph Szabo announced safety regulations requiring Positive Train Control (PTC) technology to be installed on major rail lines around the nation, as well as commuter and intercity passenger rail routes.
Read More →Train control systems such as PTC are now mandatory for most passenger rail operations and for trains hauling certain hazardous materials, but are not required for closed passenger rail systems such as light rail, rapid transit and subways.
Read More →The funding will pay for the preliminary engineering work necessary for a PTC system, which the federal government has mandated be in widespread use by 2015.
Read More →CEO David Solow will remain with the agency for the balance of this fiscal year, devoting full time to the interagency collaborations necessary for Metrolink to implement safety enhancements, including positive train control and interoperability agreements.
Read More →The NTSB recently wrapped its investigation of the crash site in August.
Read More →To date, significant work has been done to determine why the presence of train 214 was not identified on the train control circuit that allowed train 112 to crash into it. The NTSB's accident investigation is continuing, and more work is needed to fully understand why the train control system did not perform as designed.
Read More →Positive Train Control technology is capable of automatically controlling train speeds and movements should a locomotive engineer fail to take appropriate action.
Read More →The two-train collision on the MBTA Green Line last year occurred as a result of the trolley operator's failure to obey a signal indication, due to a possible sleep disorder and the lack of a positive train control system.
Read More →Includes provision requiring installation of anti-collision technology – positive train control – on railways shared by passenger and freight trains.
Read More →