Loading data...
In the coming months, agency will be updating the design specifications for streetcar vehicles.
Read More →The new rail is half the weight of the old and conducts electricity better.
Read More →The first subpoena sought records that date back to the early days of the project.
Read More →The massive reconstruction work, announced in 2016, called for a full closure of the tunnel for 18 months.
Read More →Projects include the Tempe Streetcar project in Arizona; and the Los Angeles Westside Purple Line Section 3 project.
Read More →The three-mile streetcar, scheduled to open in 2021, includes 14 stops and two Valley Metro light rail connections.
Read More →A planned four-mile streetcar system would stop at key downtown Los Angeles stops.
Read More →Will use extended shutdowns during summer months-rather than single tracking-to provide 24-hour access to work sites.
Read More →The Wave Streetcar is a 2.8-mile hybrid, fixed-rail system that would run in existing street lanes with other vehicles.
Read More →Texas Central has named it as their preferred site because of minimal environmental and community impact and ability to connect to desired destinations.
Read More →