
The pair reportedly used bolt cutters to detach the copper wire, entering maintenance hatches in a tunnel that runs below the elevated stretch of the light rail between the SeaTac and Rainier Beach rail stops, from November 2010 through August 2011.
Read More →
The project is the first funding announcement since the launch of the New Building Canada Fund, the Government of Canada's unprecedented long-term infrastructure plan.
Read More →
It was the busiest first three months of the year in Sound Transit history. Link light rail ridership grew 15%, with 2.3 million first quarter boardings and an average of almost 30,000 on weekdays.
Read More →In 2010, when CATS was concerned with whether it could afford to build the Blue Line extension, the transit system removed some features to save money
Read More →
The five-mile Orange Line extension from Belt Line Station to the newly rebuilt Terminal A at DFW will bring the longest light rail system in the U.S. to 90 miles.
Read More →
The $1.1 million system includes the installation of GPS antennas, cellular modems, specialized software and computers on all 53 light rail vehicles.
Read More →The barriers have been installed at the ends of each LRV to cover the gap between two connected trains. They are designed to act as a deterrent to riders inadvertently stepping or falling between adjoined LRVs.
Read More →The schedule for the first Green Line trains, which will roll June 14, will be on a trial basis and may be modified due to maintenance needs, according to Metro Transit officials.
Read More →Installing a solar plant capable of generating 780 kilowatts of energy annually at its light rail operations and maintenance facility in Phoenix. The plant is estimated to save the agency approximately $100,000 on average per year.
Read More →
The five-mile Orange Line extension from Belt Line Station to the newly rebuilt Terminal A at Dallas/Fort Worth International Airport will bring the nation’s longest light rail system to 90 miles.
Read More →