METRO Magazine Logo
MenuMENU
SearchSEARCH

Texas Central signs with Kiewit unit to prep for high-speed rail install

Mass. Electric will focus on core system, safety elements, including all necessary power, signaling and communications equipment.

November 27, 2019
Texas Central signs with Kiewit unit to prep for high-speed rail install

Conceptual rendering of Texas Central Railway's high-speed rail system.

Texas Central Railway

2 min to read


Conceptual rendering of Texas Central Railway's high-speed rail system.

Texas Central Railway

Texas Central, developer of the Texas high-speed train, signs agreement with train system installation firm Mass. Electric Construction Co., a subsidiary of Kiewit Corp. Mass. Electric’s work focuses on installing the core system, critical safety elements which include all necessary power, signaling and communications equipment. The company is the latest addition to the team Texas Central has assembled to build the first true high-speed trainin the U.S., which will connect Houston and North Texas in 90 minutes, including one stop in the Brazos Valley.

The Early Contract Involvement (ECI) agreement with Mass. Electric covers work through the end of 2019 to define the scope, execution plan, schedule and price for a construction contract, which is expected to be signed later this year. This agreement is the most recent milestone towards the construction phase of building the high-speed train, which is expected in 2020.

Ad Loading...

The core system that will be installed by Mass. Electric is a key component of the N700S Shinkansen technology being deployed for the Texas high-speed train. Using a “complete system approach” means from the beginning everything is designed and engineered to work together as an integrated unit — the trains, the infrastructure and the supporting high-speed rail technologies.

Specifically, under a Core Systems Installation Agreement, Mass. Electric would install the systems that supply and distribute electrical power for running the train and related equipment, signaling and control of the trains, and communications, to ensure the trains, the tracks and operators all communicate with one another and with network operations. 


More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →