MARTA's 2040 Expansion Project Enters Federal Funding Program
MARTA Track Replacement Project to Impact Red Line Service
MARTA’s Track Replacement Project will replace heavy rail between Buckhead and Medical Center stations beginning Friday, Feb. 18.

The Track Replacement Project is a multi-year effort that involves replacing track and switches throughout the rail system.
Photo: MARTA
The Metropolitan Atlanta Rapid Transit Authority (MARTA) announced it is investing approximately $225 million in State of Good Repair work on its heavy rail lines that will enhance the safety of the rail system, reduce train delays, and improve the customer experience.
MARTA’s Track Replacement Project will replace heavy rail between Buckhead and Medical Center stations beginning Friday, Feb. 18 at 9 p.m. and concluding Thursday, Feb. 24 at 4 a.m. Red Line rail service south of Dunwoody station will be suspended during this time.
The Track Replacement Project is a multi-year effort that involves replacing track and switches throughout the rail system.
The work on the Red Line includes a rail crossover (Northland) that touches both main line tracks and prevents single-tracking operations. To assist impacted customers, free bus shuttles will connect to Dunwoody, Medical Center, Buckhead, and Lenox stations and run continuously from 9 p.m. on Friday, Feb. 18, until the end of service on Wednesday, Feb. 23.
MARTAConnect will also be available to customers during the project. MARTA will provide a link to a $15 Uber or Lyft voucher that customers can download and use twice daily to travel to or from the affected rail stations. The customer is responsible for any amount over $15 per trip and will not receive a credit for any trip less than $15. Details on how and when to download the voucher will be provided as the project date nears.
MARTA station agents and transit ambassadors will be at the impacted rail stations to assist customers, and signs guiding customers between the bus shuttles and trains will be prominently displayed.
Customers who normally drive and park at North Springs, Sandy Springs, and Dunwoody stations for southbound service should consider parking at Doraville or Lindbergh stations during the project. Rail service north of Dunwoody and south of Lindbergh, and service on the Gold Line and Blue and Green Lines (east/west) will operate normally.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →