METRO Magazine Logo
MenuMENU
SearchSEARCH

TriMet to build first multi-use transit bridge in U.S.

TriMet has chosen a cable-stayed bridge type and is in the design phase in its work on a bridge that will connect both sides of the Williamette River with transit and pedestrian access.

by METRO Staff
August 11, 2009
3 min to read


TriMet, in conjunction with the City of Portland, is constructing a bridge that will accommodate buses, light rail and a potential future streetcar extension; and will have bike and 14-feet wide pedestrian paths on both sides across the Willamette River. No cars will be allowed on the structure.                                    

The bridge will be the first to be built across the Willamette River in 35 years, and will likely be the only bridge of its kind in the U.S. when completed, according to the TriMet Website.

Ad Loading...

TriMet worked with a citizens' committee, led by former Portland mayor Vera Katz, for approximately one-and-a-half years with different stakeholders and partners from both sides of the Willamette River, including designers, architects and engineers.

The committee hired Rosales + Partners and HNTB for phase one, to help select a bridge type, and reviewed nearly a dozen different designs, from concrete to segmented, said Mary Fetsch, communications director, TriMet. They eventually decided on the cable-stayed bridge type. "We were looking for something that was functional, affordable, and aesthetically appropriate to the site and its uses," she added.  

The committee is currently moving into a more advanced and detailed design phase, with HNTB and San Francisco Bay Area-based MacDonald Architects, which has worked on signature bridges worldwide, including the Golden Gate Bridge and the Bay Bridge.

As the design phase moves forward, the committee is working with water users to determine the height from the top of the water to the base of the bridge, since the bridge will not have lifting capability. The tower height will be 180 feet.

The design phase will be complete in approximately 10 months, Fetsch estimated. The projected budget at press time was $110 million.

Ad Loading...

TriMet and the City of Portland decided to construct a transit bridge because the street network and infrastructure on either side of the Willamette River cannot handle the influx of cars. To prevent cars from using the bridge, there will be a dedicated lane for trains only as they approach the bridge.

Since the bridge will have its own right-of-way, Fetsch said, it will promote ridership, because the transit provided will offer more efficient travel times.

A quick trip on the transit bridge will put the heart of downtown just minutes away, she added. The Green light rail line at the south end of downtown, which will open in September, has Portland State University (PSU), the busiest destination in the entire transit district, as its southern terminus. That line will take riders to the Portland-Milwaukie line, which will start at PSU, cross the bridge and go to the South Waterfront area. The two lines are key to providing more access to bustling areas with lots of growth potential.

On the west side of the river, in the South Waterfront area, Fetsch said that significant job growth is expected - with more than 9,900 residents and 13,600 jobs in that corridor alone - by the year 2030.

On the east side, there are approximately 900,000 visitors each year to the Oregon Museum of Science and Industry (OMSI). "They expect about 1.5 million annually, as this area develops," Fetsch noted. In addition, the bridge will be near the Portland Streetcar and within a half a mile of the Portland Aerial Tram, which stops at Oregon Health and Sciences University (OHSU), where education and healthcare facilities are located.

Ad Loading...

Fetsch predicts that because the bridge will be in such close proximity to downtown, it will be a destination in and of itself.

"It's just a great opportunity to take in our beautiful city. ...this bridge will be one of those places that, [when] people come into town, [they] will want to bike across, walk across and just see the skyline."

 

Subscribe to Our Newsletter

More Bus

Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
A shot of ENC's manufacturing facility
Busby StaffMarch 31, 2026

ENC Named 'Partner of Choice' to Support Philadelphia SEPTA’s $43M FTA Grant

SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.

Read More →
Ad Loading...
Cover photo for Bus Tech Talk with Cecil Blandon
Managementby Alex RomanMarch 27, 2026

AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.

Read More →
An MBTA bus with a passenger boarding at shelter.
Busby StaffMarch 27, 2026

MBTA Confirms Funding for Upgraded Arborway Bus Facility

When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.

Read More →
Nadine S. Lee
Managementby StaffMarch 26, 2026

DART's President/CEO Announces Departure from Agency

Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.

Read More →
Ad Loading...
Assemblywoman Castillo and ENC officials at California facility.
Busby StaffMarch 23, 2026

ENC Hosts California Assemblywoman, Celebrates American Manufacturing and Economic Growth

The visit underscored ENC's role as a major employer in Assembly District 58 and its commitment to American manufacturing and skilled local jobs.

Read More →
Cover of METROspectives episode with The Bus Coalition
BusMarch 20, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
County and agency officials break ground in front of a red and yellow King County Metro public transit bus.
Busby StaffMarch 20, 2026

Seattle’s King County Breaks Ground on RapidRide I Line to Expand High-Capacity Transit

The 17-mile RapidRide I Line will bring faster, more frequent service and improved regional connections across South King County.

Read More →
Ad Loading...
paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →