
LA Metro September Ridership Climbs 3.9%, Led by Rail Growth
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
The awards will improve the safety and reliability of movement of people and freight, as well as improve quality of life for rural residents, through investment in critical roads, bridges, and other transportation systems.
Read More →
During this phase of testing, the new low-floor trains will simulate real-world scenarios, actively pulling into stations, deploying ramps, opening and closing doors, and proceeding to the next station.
Read More →
The unprecedented investment in America’s nationwide intercity passenger rail network builds on a $16.4 billion investment announced last month for 25 projects of national significance along America’s busiest rail corridor.
Read More →
The inclusion of these two corridors into the program will help Virginia advance its goal of establishing an east-to-west passenger rail corridor.
Read More →
The service improvements are possible because Caltrain is replacing all the aging diesel trains between San Francisco and San Jose with electric trains that provide better service performance and quality, according to the agency.
Read More →
The U.S. High Speed Rail Coalition says the federal investment is a sign that “the tide has turned” for high-speed rail in America.
Read More →
The agency’s overall ridership has recovered 85% from its 2019 days, when it had its highest ridership year with 4,495,039 passengers; and weekend ridership has fully recovered back to 100%.
Read More →
The CTB's TRIP program aims to grow and improve transit use by enhancing the regional connectivity of urban areas, eliminating obstacles to transit accessibility for low-income riders, and more.
Read More →
The agency will now begin the final major phase of construction in this area, which includes fully rebuilding the remaining two, century-old Red and Purple elevated tracks.
Read More →
Under the new process, with concurrence from the Washington Metrorail Safety Commission, WMATA will increase the fit and press tonnage used to mount the wheels to the axles on the railcar.
Read More →