Alstom completes its first signaling project in Serbia
With eight out of 17 lines being dedicated exclusively to freight transport, Pancevo is one of the largest and most important Serbian railway stations.

Alstom

Alstom
Alstom has delivered its latest signaling interlocking technology to the Serbian Railway Co., working in close cooperation with the Serbian Mihajlo Pupin Institute. The project was ordered by Russian RZD International.
With eight out of 17 lines being dedicated exclusively to freight transport, Pancevo is one of the largest and most important Serbian railway stations. Its rehabilitation is the first step in an ambitious project for the reconstruction of a total of 12 miles of the Serbian railway line linking Pancevo to Belgrade, to secure the high level of commuter traffic between both cities and further optimize the international transit traffic to Romania. Today, 60 passenger and freight trains circulate daily on the line and this number is expected to reach 136 trains by 2020.
For this project, Alstom deployed its Smartlock 400 interlocking solution. Installed in more than 25 countries with different signaling principles, among which Italy, Denmark, Turkey, and Romania, the components of Smartlock are able to manage up to 1,400 routes. Smartlock 400, the latest version of the Smartlock family, interfaces directly with trackside equipment, with no need for intermediate relays. This means that reaction time can be further reduced as well minimizing trackside footprint and maintenance costs.
This project integrates Alstom’s Smartlock 400 solution with new equipment designed and produced by the Mihajlo Pupin Institute, never used before at an industrial scale. The new solution has become operational following extensive tests.
More Rail

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety
The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.
Read More →
New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →