METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom completes its first signaling project in Serbia

With eight out of 17 lines being dedicated exclusively to freight transport, Pancevo is one of the largest and most important Serbian railway stations.

March 22, 2017
Alstom completes its first signaling project in Serbia

Alstom

2 min to read


Alstom

Alstom has delivered its latest signaling interlocking technology to the Serbian Railway Co., working in close cooperation with the Serbian Mihajlo Pupin Institute. The project was ordered by Russian RZD International.

With eight out of 17 lines being dedicated exclusively to freight transport, Pancevo is one of the largest and most important Serbian railway stations. Its rehabilitation is the first step in an ambitious project for the reconstruction of a total of 12 miles of the Serbian railway line linking Pancevo to Belgrade, to secure the high level of commuter traffic between both cities and further optimize the international transit traffic to Romania. Today, 60 passenger and freight trains circulate daily on the line and this number is expected to reach 136 trains by 2020.

For this project, Alstom deployed its Smartlock 400 interlocking solution. Installed in more than 25 countries with different signaling principles, among which Italy, Denmark, Turkey, and Romania, the components of Smartlock are able to manage up to 1,400 routes. Smartlock 400, the latest version of the Smartlock family, interfaces directly with trackside equipment, with no need for intermediate relays.  This means that reaction time can be further reduced as well minimizing trackside footprint and maintenance costs.

This project integrates Alstom’s Smartlock 400 solution with new equipment designed and produced by the Mihajlo Pupin Institute, never used before at an industrial scale. The new solution has become operational following extensive tests.


More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →