METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom equips Egyptian, Belgian rail

Egypt contracts are valued at a total of $180 million, and concern the second phase of construction of Line 3 metro system. Belgian project is the first European cross-border, high-speed line equipped with Level 2 ERTMS technology.

June 22, 2009
1 min to read


On Sunday, Alstom and its partners have signed two contracts with the National Authority for Tunnels (NAT) for Line 3 of the Cairo, Egypt metro system.

 

The contracts are valued at a total of $180 million, and concern the second phase of construction of Line 3 metro system, linking the Abbasiya district with Al-Ahram, a distance of 3.7 miles. The line will ultimately extend 20.5 miles.

Ad Loading...

 

Leader of the consortium, Alstom will provide the Urbalis 200 Train Control System, points machines and station signaling equipment. Alstom’s share of the contract is worth approximately $34.6 million.

 

In addition, on June 12, Belgian operator Ifrabel inaugurated its new high-speed L3 line, equipped with Alstom’s Level 2 European Rail Traffic Management System (ERTMS) Atlas control and signaling system. 

 

This 21.7-mile line, which links Liege, Belgium with the German border via Aachen, is the first European cross-border, high-speed line equipped with Level 2 ERTMS technology.

 

Alstom also installed the Atlas system aboard four ICE3 trains in use on the rail line and will equip the fleet’s six other trains, which will come into service in 2012.

 

After winning this contract in 2008, Alstom handled the new signaling system design, manufacture, installation, testing and approval.

 

 

More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →