METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom’s APM Carries First Passengers Across New Phoenix Airport Extension 

Alstom’s relationship with the Phoenix Sky Harbor International Airport dates to 2009 and the construction of the first phase of the PHX Sky Train®.

Alstom’s APM Carries First Passengers Across New Phoenix Airport Extension 

The extension to the PHX Sky Train® provides not only increased capacity, but also more multimodal and accessible connections between the city of Phoenix and the airport.

Credit:

Alstom

2 min to read


Alstom successfully delivered the extension to the PHX Sky Train® automated people mover (APM) system at Phoenix Sky Harbor International Airport, providing airport connections to the light rail train system and the rental car center.

The extension to the PHX Sky Train® provides not only increased capacity, but also more multimodal and accessible connections between the city of Phoenix and the airport, as well as an enhanced overall airport experience for domestic and international travelers.

Ad Loading...

Under the scope of its contract for the 2.5-mile extension, Alstom delivered a full turnkey solution comprised of electro-mechanical and guideway equipment, expansion of the current maintenance and storage facility, a maintenance recovery vehicle, retrofitted the wayside signaling system, and upgraded vehicles already in operation today.

In addition, 24 new Innovia APM 200 vehicles allow for three-car trains, up from two-car trains, which means being able to move more passengers more comfortably and more quickly in and around the airport facilities. Alstom delivered the extension, while maintaining current operations of the PHX Sky Train® throughout construction and testing, with no impact to availability or reliability of the system.

“Our partnership with Phoenix Sky Harbor International Airport is grounded in a shared vision and commitment to improve passenger connectivity” says Michael Keroullé, president of Alstom Americas. “The complexity of this extension project was tied to the need to maintain airport connectivity services aligned with passenger expectations during construction and especially at the time of integrating the extension to the existing system. What we have achieved today demonstrates the power of a great and collaborative partnership with Phoenix Sky Harbor International Airport, an important asset as we continue to operate and maintain the expanded Sky Train system for the years to come.”

Alstom’s relationship with the Phoenix Sky Harbor International Airport dates to 2009 and the construction of the first phase of the PHX Sky Train. For phase 1 construction, Alstom designed and supplied all electrical and mechanical equipment, a maintenance facility, and 18 Innovia APM 200 vehicles.

Additionally, since 2013, Alstom has operated and maintained the PHX Sky Train® since it first started carrying passengers — 24 hours per day and 365 days a year — and will continue to operate and maintain the entire 4.2-mile system for the next 10 years. The PHX Sky Train® has a proven track record, achieving near flawless performance — consistently over 99.5% availability — since the system opened. This is the third installation of Innovia APM 200, following Dallas Fort Worth International Airport and Heathrow Terminal 5 Transit.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →