METRO Magazine Logo
MenuMENU
SearchSEARCH

Calif., Texas awarded funds for rail

The analyses funded by the Texas grant will examine future ridership and revenue forecasts, capital costs, environmental issues, and routing and station location options, among other important planning considerations.

November 18, 2011
2 min to read


U.S. Transportation Secretary Ray LaHood announced the award of $21 million for the California Department of Transportation (Caltrans) for engineering to begin on three projects to improve Southern California's Pacific Surfliner Corridor, one of the nation's most popular passenger corridors.

Highlights of the rail projects include:

Ad Loading...
  • Pacific Surfliner Corridor in the City of Oceanside: $4 million for preliminary engineering and environmental work for the construction of second main track and replacement of an aging railway bridge over the San Luis Rey River. This project will help alleviate residual train delays in the area and provide on-time performance benefits to intercity passenger trains. The project will also connect two existing sections of double track.

  • Pacific Surfliner Corridor in the City of Del Mar: $7 million for preliminary engineering and environmental work for the construction of a 1.1 mile section of second main track, replacement of a timber trestle railway bridge built in 1916 and signal improvements. This project also includes a permanent seasonal rail platform with direct access to the Del Mar Fairgrounds, a major trip generator in San Diego County. When constructed this project will help alleviate current train delays, increase operational flexibility and improve on-time performance for intercity, commuter and freight operations.

  • Pacific Surfliner Elvira to Morena Double-Track Project: $10 million for design, environmental and engineering work. When constructed, this project will connect two sections of double track, resulting in a 10.3-mile stretch of double track. This is part of the long-range plan to double track the San Diego segment of the corridor that will alleviate train delays, increase operational flexibility, improve on-time performance, and remove a capacity constraint to future intercity passenger rail service on the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Corridor.

Secretary LaHood also announced that the Texas Department of Transportation (TxDOT) was awarded $5.6 million for planning and environmental work to advance the development of the Oklahoma City-South Texas Corridor.

Future intercity passenger rail service will connect Oklahoma City, Dallas-Fort Worth, Austin, San Antonio and South Texas. The analyses funded by the grant will examine future ridership and revenue forecasts, capital costs, environmental issues, and routing and station location options, among other important planning considerations.

Ad Loading...

Earlier this year, Secretary LaHood announced a similar planning grant for high-speed rail service between Dallas-Fort Worth and Houston.

 

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →