Dallas' Orange Line wins FTA award
Established as a best practice for other transit agencies to use, the award recognizes exemplary efforts in preparing effective and practical environmental documents consistent with prevailing requirements and expectations while achieving the objective of paperwork reduction.
Dallas Area Rapid Transit's (DART) Northwest Corridor to Irving/DFW Final Environmental Impact Statement (FEIS) is the recipient of the Federal Transit Administration's (FTA) Outstanding Achievement Award for Excellence in Environmental Document Preparation.
The FEIS provided the environmental clearances for the first nine miles of the Orange Line extending from Bachman Station in northwest Dallas to Belt Line Station near DFW International Airport.
DART is only the second winner of this FTA award, which will be presented in Orlando, Fla. at the annual October meeting of the American Public Transportation Association.
Established as a best practice for other transit agencies to use, the FTA award recognizes exemplary efforts in preparing effective and practical environmental documents consistent with prevailing requirements and expectations while achieving the objective of paperwork reduction.
Construction is currently under way on the first nine miles of the new Orange Line that will branch from the Green Line in northwest Dallas through Irving to Las Colinas in 2011 and Belt Line Station in 2012. The line will be extended to DFW International Airport by 2013.
The Orange Line is part of largest light rail project currently under construction in North America. Along with the completion of the 28-mile Green Line in December 2010 and the five-mile Blue Line extension from Garland to Rowlett in December 2012, DART is on pace to nearly double its light rail network to 90 miles by 2013.
More Rail

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety
The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.
Read More →
New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →