METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA issues $250M Notice of Funding Opportunity for PTC projects

Fourteen railroads report they have installed 100 percent of the hardware necessary for PTC system implementation, as of March 31, 2018.

May 16, 2018
FRA issues $250M Notice of Funding Opportunity for PTC projects

Fourteen railroads report they have installed 100 percent of the hardware necessary for PTC system implementation, as of March 31, 2018.

2 min to read


Fourteen railroads report they have installed 100 percent of the hardware necessary for PTC system implementation, as of March 31, 2018.

The Federal Railroad Administration (FRA) issued a Notice of Funding Opportunity (NOFO) for $250 million in Positive Train Control (PTC) Systems Grants.

The purpose of the NOFO is to solicit applications for $250 million in PTC Systems Grants to fund the deployment of PTC system technology for intercity passenger rail transportation, freight rail transportation and/or commuter rail passenger transportation. Eligible projects include: back office systems; wayside, communications and onboard hardware equipment; software; equipment installation; spectrum; any component, testing and training for the implementation of PTC systems; and interoperability.

Applications for PTC systems deployment funding under this solicitation are due no later than 5 p.m. EDT, 45 days after the date of publication in the Federal Register. These grants form part of the funding available under the Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program.

In addition, the FRA released the 2018 Quarter 1 (Q1) status update on railroads’ self-reported progress toward implementing PTC systems. These reports were initiated by FRA to maintain transparency throughout the PTC implementation process.

Fourteen railroads report they have installed 100% of the hardware necessary for PTC system implementation, as of March 31, 2018. Railroads’ self-reported data indicates that during Q1 of 2018, six other railroads — i.e., Altamont Corridor Express, Central Florida Rail Corridor (Sunrail), Consolidated Rail Corporation (Conrail), Maryland Area Regional Commuter (MARC), Metro-North Commuter Railroad, and South Florida Regional Transportation Authority (Tri-rail) — increased their percentage of hardware installation by more than 10 percent, compared to Quarter 4 of 2017.

The latest data, current as of March 31, 2018, shows PTC systems are in operation on approximately 60% of freight railroads’ route miles that are required to be governed by PTC systems — up from 56% last quarter and 16% on Dec. 31, 2016. Passenger railroads have made less progress — with PTC systems in operation on only 25% of required route miles, up one percent from the previous quarter.

For more key implementation data for Q1, see the infographics here: https://www.fra.dot.gov/ptc. To view the public version of each railroad’s Quarterly PTC Progress Report (Form FRA F 6180.165, OMB Control No. 2130-0553) for Quarter 1 of 2018, please visit each railroad’s PTC docket on https://www.regulations.gov/. Railroads’ PTC docket numbers are available at https://www.fra.dot.gov/Page/P0628.

PTC System Grants under the CRISI Program will be published in the Federal Register. To view the NOFO, visit https://www.fra.dot.gov/eLib/Details/L19510.


More Rail

Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Ad Loading...
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
Ad Loading...
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
Ad Loading...
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →