METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA issues safety advisory on speed restriction compliance

Recommendations include having railroad operators review the circumstances of the Metro-North derailment with their operating employees and provide instruction to employees on the importance of compliance with maximum authorized train speed limits.

December 11, 2013
3 min to read


The Federal Railroad Administration (FRA) issued an industry-wide safety advisory to help ensure railroads adhere to federal regulations regarding maximum authorized train speed limits. The advisory contains four recommendations to ensure railroads comply with speed restrictions through appropriate operating policies, procedures and effective implementation.

“Safety is our highest priority, and the Metro-North crash illustrates how important it is for railroads to follow speed limits,” said U.S. Transportation Secretary Anthony Foxx. “This safety advisory, along with the other enforcement measures we’ve taken, will remind all employees of the need to follow speed limits and will help improve safety across all rail lines.”

The advisory provides guidance on four recommended measures FRA expects railroads to take action on immediately. Among them are:

  • Review the circumstances of the Dec. 1 Spuyten Duyvil derailment with their operating employees.

Ad Loading...
  • Provide instruction to employees during training classes and safety briefings on the importance of compliance with maximum authorized train speed limits and other speed restrictions.

  • Evaluate results of operational data regarding speed testing.

  • Reinforce the importance of communication between train crewmembers located in the controlling locomotive, particularly during safety-critical periods when multiple tasks are occurring and during extended periods of inactivity.

“Although the industry’s overall safety record is good, the Metro-North accident is a stark reminder of the need to remain vigilant in ensuring compliance with operational speed limits,” said Federal Railroad Administrator Joseph C. Szabo. “Over the last decade, train accidents have declined by 43 percent nationally, a result of our rigorous safety regime, but we must always do better as we drive continuous safety improvement.”

Last week, the FRA issued Emergency Order 29 (EO 29) to Metro-North Commuter Railroad (MNCW) directing it to take specific, immediate steps to ensure its train crews do not exceed speed limits. EO 29 requires Metro-North to modify its existing signal system to ensure that operators obey speed limits, and to provide two qualified railroad employees to operate trains where major speed restrictions are in place until its signal system is modified.

The FRA also issued a letter calling on Metro-North to launch a safety stand-down with all employees and to fully implement the confidential close-call reporting system, which has helped improve rail safety on other lines.  Metro-North has written the FRA to outline its plans to comply with the directives, and the FRA will continue working directly with Metro-North staff as they implement the provisions.

The FRA had already increased its oversight and enforcement of Metro-North’s rail lines following the May 2013 crash, including additional inspections of its lines and audits of Metro-North’s operations and compliance with federal regulations. FRA is also planning to conduct an extensive investigation of the carrier’s safety compliance with all regulated railroad safety disciplines.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →