Over its nearly 30-year history, the MSRC has distributed more than $440 million in funding to innovative clean air projects.
Steve Hymon
2 min to read
Over its nearly 30-year history, the MSRC has distributed more than $440 million in funding to innovative clean air projects.
Steve Hymon
The Los Angeles County Metropolitan Transportation Authority (Metro) completed an engine retrofit project to reduce emissions on a significant number of its fleet of more than 2,200 compressed natural gas (CNG) fueled buses.
Metro repowered 125 of its transit buses with new Cummins ISLG and L9N Near Zero Emission Natural Gas-Fueled Heavy Duty Engines, which will reduce emissions of nitrogen oxides (NOx) by 90% and greenhouse gases by 9%.
Ad Loading...
The Mobile Source Air Pollution Reduction Review Committee (MSRC) provided Metro with $1.8 million in Clean Transportation Funding to complete the installation of the 125 new lower emitting engines in its fleet of 45-foot series composite buses. The MSRC allocates Clean Transportation Funding from a $4 surcharge on vehicle license fees, specifically to be used for local projects designed to reduce air pollution from motor vehicles.
The Cummins ISLG and L9N Near Zero Emission Natural Gas Fueled Heavy Duty Engine was the first CNG mid-range engine to receive emissions certifications from the U.S. Environmental Protection Agency and the California Air Resources Board, which meets the 0.02 g/bhp-hr optional near zero NOx emission standard.
Over its nearly 30-year history, the MSRC has distributed more than $440 million in funding to innovative clean air projects — like these near zero emission engine retrofits — throughout LA, Orange, Riverside, and San Bernardino Counties that have helped remove as much as 13,000 tons of air pollution from the skies of Southern California.
In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.
Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.
Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.
Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.
SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.
In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.
When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.