LA Metro receives unsolicited proposal for accelerated delivery of BRT project
The agency’s Office of Extraordinary Innovation is now in the process of assembling a phase 1 review team to evaluate the concept on its financial and technical merit.
The Los Angeles County Metropolitan Transportation Authority (Metro) received an unsolicited proposal from AECOM and John Laing to bring advanced cutting-edge mobility technologies and next generation bus rapid transit to the Vermont Avenue Transit Corridor through a public-private partnership (P3).
Additionally, the proposal could result in early delivery of this critical Measure M project. This is the first proposal Metro has received for this Measure M project and the 11th proposing an alternative delivery method for a major capital project.
Ad Loading...
“Partnerships give us new opportunities and resources to bring ideas to life,” said L.A. Mayor and Metro Board Chair Eric Garcetti. “Measure M is helping us attract the kind of creative thinking and transformative technology that will accelerate our transportation future.”
Metro’s Office of Extraordinary Innovation (OEI) is now in the process of assembling a phase 1 review team to evaluate the concept on its financial and technical merit.
“We are encouraged by this proposal for a much needed project that will have a major impact on an important north/south corridor,” said Metro CEO Phillip A. Washington. “It’s another sign that the private sector is getting on board to help us advance our transportation revolution in Los Angeles County.”
The review team will be charged with reaching a decision on whether to advance the proposal to the next phase for a more detailed financial and technical review, decline further review or proceed directly to a competitive solicitation.
“P3s are a critical mechanism for bringing innovation to project delivery,” said Metro Chief Innovation Officer Joshua Schank. “The technology solutions envisioned in this proposal show that such innovation has a place in every corner of our system, from subways to light rail to bus.”
The Vermont corridor extends approximately 12.5 miles from Hollywood Boulevard south to 120th Street. It is the second busiest corridor in Los Angeles County, behind Wilshire Boulevard, with more than 45,000 weekday boardings. In addition to being one of the busiest corridors in the region, there also are approximately 150,775 people who reside in the study area, one half mile on either side.
The Vermont Avenue Transit Corridor project would help to improve transit travel speeds, relieve crowding on current service and improve on-time performance, in addition to increasing connectivity to other Metro services, such as the Red and Purple Line subway and Green Line and Expo Line light rail services.
The project is planned to receive $25 million from Measure M and $400 million from other sources. Under the Measure M spending plan, the project is scheduled to break ground in 2024 and is projected for completion between 2028 and 2030.
The company partners with manufacturers such as Kiel Seating, Camira Fabric, and TSI Video, focusing on areas that directly impact both passenger experience and operational performance.
Now in its latest edition, the awards recognize forward-thinking solutions that improve safety, operational efficiency, sustainability, rider experience, and overall system performance.
Advances in data and analytics are giving transit agencies new opportunities to refine maintenance practices, improve efficiency and make more informed decisions about asset performance.
In Part 2 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his maintenance team’s work with various types of vehicle, training, augmented reality, and more.
In this Consultant Roundtable, Carmen C. Cham shares insights on how agencies can create spaces that are intuitive, connected and built for long-term impact.
The Siemens CBTC System, Trainguard MT, in compliance with New York Subway Interoperability Interface Specifications, enables trains to run as close as 90 seconds apart, using next-generation signaling and continuous communication to keep operations moving seamlessly.
Through the strategic partnership, MOIA America will provide MOIA’s turnkey autonomous mobility solution. This includes purpose-built, autonomous-ready ID. Buzz vehicles equipped with the self-driving system developed by Mobileye, as well as operator training and enablement.
Officials said the project delivers a fully integrated passenger environment featuring improved solar-powered LED lighting, real-time arrival information, and a precision-engineered shelter designed to withstand the Texas climate.
Two battery-electric buses entered service on Earth Day, with four additional vehicles expected to join the fleet this summer. Seven more buses are planned for the end of 2027, bringing Metro’s total zero-emission fleet to 13.