METRO Magazine Logo
MenuMENU
SearchSEARCH

LIRR rolls out newest fleet of railcars

The new cars incorporate and improve upon the most successful and popular features of the MTA’s two recent electric car fleets.

September 11, 2019
LIRR rolls out newest fleet of railcars

The cars are designed and manufactured by Kawasaki Rail Car, based in Yonkers, N.Y.

LIRR

2 min to read


The cars have exterior destination signs on the front of cars that are visible to passengers as the train approaches the station, similar to the new cars on Metro-North’s New Haven Line. LIRR

Long Island Rail Road (LIRR) introduced its next fleet of railcars, known as the “M9” cars, into passenger service on Wednesday.

The new cars incorporate and improve upon the most successful and popular features of the MTA’s two recent electric car fleets, the LIRR’s familiar M7s electric cars, and the M8 cars serving Metro-North’s New Haven Line, and will enhance safety.

Ad Loading...

The fleet will consist of 202 cars, the last of which are expected to begin passenger service in March 2021.

The cars have exterior destination signs on the front of cars that are visible to passengers as the train approaches the station, similar to the new cars on Metro-North’s New Haven Line. They also feature electrical outlets on both sides of the car in each row of seats, and closed loop armrests that won’t tear garments or catch bag straps.

The cars are designed and manufactured by Kawasaki Rail Car, based in Yonkers, N.Y. LIRR

The cars will feature an innovation that is new for the first time in the region: an electronic display that will let passengers know what car within the train they are seated (for example, “Car 3 of 10”), which will be of help to customers exiting at stations where not every car will meet the platform.

Walking from car to car will become easier because between every other car there will be a door that operates at the push of a button. The seats in the cars will be slightly wider than the seats on the M7 cars, and the cars will seat more people than the M7 cars, with up to 6 additional seats in each pair of cars, according to LIRR.

The fleet will consist of 202 cars, the last of which are expected to begin passenger service in March 2021. LIRR

The cars also have cameras in the train engineer’s cab, facing into the cab to monitor the engineer’s alertness and facing forward to show the tracks ahead, and cameras in the passenger area of the cars to serve as a deterrent to criminal activity.

Ad Loading...

The cars are designed and manufactured by Kawasaki Rail Car, based in Yonkers, N.Y. The first 14 pilot cars were built in Japan, with these first eight aggressively tested in Pueblo, Colo., before further aggressive testing on the tracks of the LIRR. The remaining 188 cars are being manufactured in Lincoln, Neb., with final assembly taking place in Yonkers.

More Rail

A BART train on the tracks.
Railby StaffApril 13, 2026

San Francisco's BART Breaks Multiple Records for Post-Pandemic Ridership in March

BART recorded 5,403,140 exits in March, making it the highest monthly ridership since the pandemic and surpassing the previous high set in October 2025 (5,346,890 exits).

Read More →
Ribbon cutting photo celebrating SEPTA's new Ardmore Station
Railby StaffApril 13, 2026

Philadelphia's SEPTA Celebrates New Ardmore Station

The station was rebuilt as part of SEPTA’s Station Accessibility Program, making it fully ADA accessible with new elevators, ramps, and high-level platforms.

Read More →
Two Metra locomotives on rail tracks.
Railby StaffApril 10, 2026

Metra Reaches New 10-Year Agreement with BNSF

The announcement highlights the long-standing partnership between the Class I railroad and the commuter rail system, dating back to Metra's creation in 1983.

Read More →
Ad Loading...
Ribbon cutting at Siemens' new North Carolina facility.
Railby StaffApril 9, 2026

Siemens Opens North Carolina Railcar Manufacturing Facility

Site construction is complete, production is underway, and the first locally built passenger coaches are on track for delivery in Summer 2026.

Read More →
Two MBTA railcars in station.
Railby StaffApril 9, 2026

MBTA Completes Key Red Line Signal Upgrade Weeks Early

Crews completed a significant portion of the testing required before commissioning the new, digital signaling system, which will bring important upgrades that strengthen Red Line service reliability for riders and provide Red Line Operations the ability to route trains more quickly, turn trains around faster, and recover from unplanned disruptions more efficiently, said MBTA officials. 

Read More →
A Metra train on the rails
Railby StaffApril 8, 2026

Metra Reveals 2026 Construction Program

In addition to new projects, progress continues on a multiyear effort to upgrade track, electrical, and signal systems on the Metra Electric Line to accommodate the expansion of service on the South Shore Line.

Read More →
Ad Loading...
Governor Moore speaking at Maryland light rail station
Managementby StaffApril 7, 2026

Governor Advances Transit-Oriented Development in Baltimore

The Maryland Transit Administration is advancing the nearly $1.4 billion Light Rail Modernization Program, which modernizes the Baltimore Central Light Rail Line from Hunt Valley to BWI Thurgood Marshall Airport with new, low-floor vehicles and upgrades to all light rail stations, systems, and maintenance facilities.

Read More →
A fleet of Caltrain electrified trains on tracks
Railby StaffApril 3, 2026

Funding Gap Could Force Caltrain to Slash Service, Close Stations

The Peninsula Corridor Joint Powers Board recently met for a budget workshop, during which staff outlined the significant service reductions Caltrain could be forced to make without new external funding. 

Read More →
SEPTA's Exo railcars
Railby StaffApril 2, 2026

SEPTA Purchases Montreal Coach Cars to Bolster Regional Rail Fleet

Funding for the purchase of the railcars comes from the nearly $220 million in additional capital dollars Gov. Josh Shapiro allocated in November 2025 to support urgent safety upgrades and infrastructure improvements.

Read More →
Ad Loading...
The South Shore Line with Passengers
Railby StaffApril 1, 2026

South Shore Line Extension Debuts, Boosting Rail Access in Northwest Indiana

The $945 million project connects four new stations and expands regional mobility.

Read More →