METRO Magazine Logo
MenuMENU
SearchSEARCH

LIRR rolls out newest fleet of railcars

The new cars incorporate and improve upon the most successful and popular features of the MTA’s two recent electric car fleets.

September 11, 2019
LIRR rolls out newest fleet of railcars

The cars are designed and manufactured by Kawasaki Rail Car, based in Yonkers, N.Y.

LIRR

2 min to read


The cars have exterior destination signs on the front of cars that are visible to passengers as the train approaches the station, similar to the new cars on Metro-North’s New Haven Line.

LIRR

Long Island Rail Road (LIRR) introduced its next fleet of railcars, known as the “M9” cars, into passenger service on Wednesday.

The new cars incorporate and improve upon the most successful and popular features of the MTA’s two recent electric car fleets, the LIRR’s familiar M7s electric cars, and the M8 cars serving Metro-North’s New Haven Line, and will enhance safety.

Ad Loading...

The fleet will consist of 202 cars, the last of which are expected to begin passenger service in March 2021.

The cars have exterior destination signs on the front of cars that are visible to passengers as the train approaches the station, similar to the new cars on Metro-North’s New Haven Line. They also feature electrical outlets on both sides of the car in each row of seats, and closed loop armrests that won’t tear garments or catch bag straps.

The cars are designed and manufactured by Kawasaki Rail Car, based in Yonkers, N.Y.

LIRR

The cars will feature an innovation that is new for the first time in the region: an electronic display that will let passengers know what car within the train they are seated (for example, “Car 3 of 10”), which will be of help to customers exiting at stations where not every car will meet the platform.

Walking from car to car will become easier because between every other car there will be a door that operates at the push of a button. The seats in the cars will be slightly wider than the seats on the M7 cars, and the cars will seat more people than the M7 cars, with up to 6 additional seats in each pair of cars, according to LIRR.

The fleet will consist of 202 cars, the last of which are expected to begin passenger service in March 2021.

LIRR

The cars also have cameras in the train engineer’s cab, facing into the cab to monitor the engineer’s alertness and facing forward to show the tracks ahead, and cameras in the passenger area of the cars to serve as a deterrent to criminal activity.

Ad Loading...

The cars are designed and manufactured by Kawasaki Rail Car, based in Yonkers, N.Y. The first 14 pilot cars were built in Japan, with these first eight aggressively tested in Pueblo, Colo., before further aggressive testing on the tracks of the LIRR. The remaining 188 cars are being manufactured in Lincoln, Neb., with final assembly taking place in Yonkers.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →