NCTD assumes coastal dispatching responsibility
In January 2011, NCTD awarded a contract to HTSI for the installation of a new train control management system and the provision of dispatch services for a 10-year period on the coastal rail line and the inland SPRINTER light-rail line that runs from Oceanside to Escondido.
The North County Transit District, (NCTD) through its contract with Herzog Transit Service Inc., (HTSI) will assume dispatching responsibility for the 60-mile coastal rail line that begins at the Santa Fe Depot in San Diego County and ends at the Orange County line.
In January 2011, NCTD awarded a contract to HTSI for the installation of a new train control management system and the provision of dispatch services for a 10-year period on the coastal rail line and the inland SPRINTER light-rail line that runs from Oceanside to Escondido.
HTSI has successfully implemented the new train control system and assumed responsibility of dispatching the inland light-rail line from Veolia on July 9, 2011. HTSI has also successfully completed rigorous safety testing and federal and state audits that have validated their readiness to assume dispatch responsibilities for both rail lines.
NCTD owns the inland rail line and jointly owns the coastal rail line with the San Diego Metropolitan Transit System (MTS). NCTD, through its joint ownership agreement with MTS, is responsible for the daily operations and maintenance of the entire coastal rail line. The coastal rail line in San Diego supports the operations of two commuter rail operators, COASTER and Metrolink, as well as Amtrak’s intercity service, and two freight operators — BNSF and Pacific Sun.
NCTD and HTSI have coordinated the implementation of the new train control system and assumption of dispatch responsibilities with all of the operators on the corridor.
The assumption of dispatch responsibilities will assist NCTD in its efforts to better coordinate connections between buses and trains as the consolidation of dispatching the rail lines is part of a larger business initiative to centralize bus, rail, safety and security communications into one location.
This work is the lead-in to NCTD’s continuing effort to implement positive train control ahead of the Dec, 31, 2015 deadline as mandated by the Rail Safety Improvement Act of 2008.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →