METRO Magazine Logo
MenuMENU
SearchSEARCH

NJ Transit orders 100 Bombardier railcars

The contract is valued at approximately $267 million and includes options for up to 79 additional vehicles.

September 1, 2010
2 min to read


Bombardier Transportation received an order for 100 MultiLevel commuter railcars from the New Jersey Transit Corp. (NJ Transit). The contract is valued at approximately $267 million and includes options for up to 79 additional vehicles.

The order represents Bombardier's second contract with NJ Transit for this type of vehicle. Under a 2003 contract, Bombardier provided 329 MultiLevel vehicles now in successful operation at NJ Transit.

The MultiLevel vehicles feature upper and lower seating levels as well as a spacious intermediate level at each end of the car and offer high levels of capacity, comfort and convenience. Each coach has 15 percent to 30 percent more seating capacity than a typical single-level car, yet is specially designed to meet the infrastructure constraints of certain rail networks, such as those posed by tunnels.

Comfort features include a two-by-two seating configuration that eliminates the middle seat found on many single-level vehicles, specially designed seats with improved lumbar support, and more leg room, knee room and seat width than found in conventional coaches. Large side doors located at the intermediate level provide accessibility from both high and low level platforms.

Over the years, Bombardier has provided hundreds of push-pull commuter coaches and MultiLevel vehicles to NJ Transit. Bombardier has supplied 29 electric locomotives of the type BOMBARDIER ALP-46 and is currently filling orders for 36 ALP-46A electric locomotives, an upgraded version of the original product, as well as 26 ALP-45DP dual-powered locomotives.

Ad Loading...

In addition, Bombardier was a member of the consortium that designed and built NJ Transit's turnkey RiverLINE light rail system between Camden and Trenton, New Jersey and now operates and maintains the system under a contract with NJ Transit.

Topics:Rail

More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →