METRO Magazine Logo
MenuMENU
SearchSEARCH

Pie-IX BRT Extension Begins

Work on the Pie-IX BRT extension will be carried out in four phases until summer 2027 to maintain traffic in both directions and access during construction.

Pie-IX BRT Extension Begins

The first phase involves preparatory work at two intersections: De Rouen Street and Pie-IX Boulevard, and Sainte-Catherine Street East and Pie-IX Boulevard. 

Photo: STM

2 min to read


The first phase of work to extend the Pie-IX BRT between Pierre-De-Coubertin Avenue and Notre-Dame Street East has begun, according to Société de transport de Montréal's news release.

Work on the Pie-IX BRT extension will be carried out in four phases until summer 2027 to maintain traffic in both directions and access during construction.

Ad Loading...

Pie-IX BRT's First Phase 

The first phase involves preparatory work at two intersections: De Rouen Street and Pie-IX Boulevard, and Sainte-Catherine Street East and Pie-IX Boulevard.

Specifically, this phase includes the construction of access shafts and underground conduits for cabling.

Work will be carried out during the day on weekdays, but some work may need to take place in the evenings and on weekends.

During the first phase of the work, buses will continue to run on Pie-IX Boulevard. However, some stops may be moved as needed.

This phase is expected to be complete in winter 2024.

Ad Loading...

Canopy Management

To add reserved inner lanes, build wider sidewalks, and keep all traffic lanes open, the Pie-IX BRT work will require cutting down trees.

All project partners have acted in the interest of preserving as many healthy trees as possible on Pie-IX Boulevard.

Analyses were conducted with a specialized urban forestry company, in collaboration with the borough, to find the best possible solutions before the start of the work.

The plan is to plant more than two trees for each one cut down—for a total of 230 trees—while also diversifying the canopy with 12 different species.

The new trees will be planted along the side of the road. The felled trees will also be recycled by an organization that uses urban wood to make things like street furniture.

Topics:BRTBus

More Bus

A picture of a San Diego MTS railcar and bus at a transit station.
Managementby StaffApril 17, 2026

San Diego Transit Agencies Propose Fare Hike to Close Budget Gaps

The agencies, San Diego MTS and NCTD - San Diego Railroad, which share a fare system (PRONTO), proposed the changes to help address their respective financial sustainability strategies.

Read More →
A Fresno Area Express bus refurbished by Complete Coach Works.
Busby StaffApril 17, 2026

Complete Coach Works Completes 11 CNG Bus Refurbishment Project for Fresno Area Express

The project was awarded under the Washington State Contract, enabling FAX to streamline its procurement processes while ensuring value and quality from an experienced transit solutions provider, said officials.

Read More →
A MARTA 60-foot articulated bus.
Busby StaffApril 16, 2026

MARTA Set to Launch Next Gen Bus Network

The historic initiative represents the first time since MARTA began bus operations in the early 1970s that the entire system has been redrawn from scratch.

Read More →
Ad Loading...
A Coach USA Van Hool CX 45 delivered by ABC Companies.
Busby StaffApril 15, 2026

ABC Delivers Van Hools to Coach USA and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from suppliers including Moovit, CAF, and more.

Read More →
A headshot of Inez Evans Benson
Busby Alex RomanApril 15, 2026

Inez Evans Benson on Rethinking Transit Through Customer Experience

The WSP leader discusses why agencies must look beyond satisfaction metrics and take a more holistic, community-driven approach to service.

Read More →
FlixBus vehicles in a parking garage.
ManagementApril 13, 2026

Intercity Bus Industry Outlook: A Mix of Apprehension & Optimism

Industry leaders see both promise and peril ahead as intercity bus travel rebounds, but unpredictable market forces threaten to reshape the sector.

Read More →
Ad Loading...
Cover Photo for Bus Tech Talk
ManagementApril 9, 2026

Bus Tech Talk: AC Transit’s Cecil Blandon on Leadership, Mentorship, and a Career in Transit

In Part 1, Blandon shares his journey from the U.S. Marines to a leadership role in public transit, along with insights on mentorship and professional growth within the industry.

Read More →
A blurry TransLink R2 rapid bus
Managementby StaffApril 8, 2026

Vancouver's TransLink Fast-Tracks RapidBus Line to Metrotown

Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.

Read More →
Complete Parts logo
Busby StaffApril 1, 2026

Complete Coach Works Unveils Reimagined Parts Department with Expanded Capabilities

Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.  

Read More →
Ad Loading...
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →