St. Louis Metro opens $4.3M paint facility
Located in East St. Louis, Ill., the new $4.3 million facility enables Metro to prepare and paint the LRVs in an environmentally controlled area that is healthier for employees and better for the environment.
On Monday, Regional transit leaders joined with state and local elected officials to celebrate the grand opening of St. Louis Metro's new paint facility that will be used to repaint the MetroLink light rail vehicles (LRV).
Located in East St. Louis, Ill., the new $4.3 million facility enables Metro to prepare and paint the LRVs in an environmentally controlled area that is healthier for employees and better for the environment.
Many of the 87 LRVs in the Metro System have been in service since the 1990s, and average 500 miles per day as they carry passengers back and forth along the 46-mile alignment. While Metro has been manually repainting the LRVs at its maintenance facility in St. Louis, the new paint booth will improve the process through increased technology and minimize the environmental impact of maintaining the trains.
The new facility is a 9,600-square-foot pre-cast panel structure containing two distinct work areas, one of which is the totally enclosed paint booth. This design enables Metro employees to clean and prepare the trains for painting on one side of the facility, while other trains are simultaneously being painted on the other.
The prep area includes a dust collection system that is one of the "green" features of the operation. Six separate work areas in the prep bay, where employees use various air tools, are tied into a central vacuum system that will collect all the dust and other particles and transport them to dust collection bags in a separate room.
The paint booth itself is equipped with two automated "lifts" that give the individuals applying the spray paint easy access to all parts of the train. Each lift can accommodate up to two painters, further streamlining the process. The trains are painted with low VOC (volatile organic compounds) paint, and an extensive exhaust system helps to further minimize the environmental impact of the process, while also reducing the risk of dust or other particles marring the paint job.
"This facility will allow Metro to effectively and efficiently restore the body of the Light Rail Vehicles, extend the service life of each train and create a consistent image for Metro's customers," said Ray Friem, Metro's COO, transit services.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →