METRO Magazine Logo
MenuMENU
SearchSEARCH

Stadler to Modernize Atlanta's Signaling Tech

The replacement of the current system will improve train control, which in turn increases rail safety and on-time performance.

December 6, 2024
Stadler to Modernize Atlanta's Signaling Tech

The Stadler system will work seamlessly with MARTA’s new Stadler CQ400 railcars being introduced in 2025. 

Photo: MARTA

2 min to read


The Metropolitan Atlanta Rapid Transit Authority (MARTA) board awarded Stadler a $500 million contract to equip the agency’s rail network with a new train control system. 

The replacement of the current system will improve train control, which in turn increases rail safety and on-time performance. 

Ad Loading...

“This investment will enhance the safety and reliability of our rail network and allow our trains to operate with the highest safety standards, while still being monitored and controlled by skilled MARTA operators,” said MARTA GM/CEO Collie Greenwood. “The system will allow us to increase capacity, improve on-time performance, and optimize efficiency. By doing so, we’ll improve the customer experience and position MARTA as one of the most advanced transportation systems in the country.”

A Key Safety Feature

CBTC is an advanced train control system that uses wireless communication to precisely track trains at all times. Thanks to the real-time information on train positioning, trains can be operated more precisely, safely, and efficiently. 

“This order is a significant milestone and represents an international market breakthrough for us in the CBTC sector,” says Markus Bernsteiner, Group CEO Stadler Rail. “MARTA and its passengers can look forward to a state-of-the-art train control system that will make Metro operations more punctual, safer, and more efficient. We look forward to working with MARTA, thank them for the trust they have placed in us and for now relying on our train control solution in addition to their trains.” 

Adding Stadler’s New Tech

The Stadler system will work seamlessly with MARTA’s new Stadler CQ400 railcars being introduced in 2025. The resulting synergies between the on-board and trackside signaling components will allow for a smooth introduction of the system and increase operational performance while minimizing downtime.

The vehicles will be equipped with the necessary hardware at the Stadler plant in Salt Lake City, where the 56 new MARTA trains ordered in 2019 are being built. 

Ad Loading...

The trackside equipment will be installed, tested, and commissioned directly on the MARTA network. As the on-board and trackside components come from the same supplier, the project can be completed seamlessly. 

During a transition phase, trains will be able to run with both the old and the new system. As soon as the trackside components have been installed across the board, the transition process to the new system will be smooth and without any interruption to operations. 

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →