METRO Magazine Logo
MenuMENU
SearchSEARCH

Sutrak's all-electric HVAC providing results

The ACE 238DLGS system was chosen for the new buses, which consists of two independent self-contained housings and an air-cooled generator, belt driven from the main engine.

October 4, 2011
Sutrak's all-electric HVAC providing results

 

2 min to read


In 2011, Fla.-based Broward County Transit took delivery of hybrid articulated buses featuring all-electric HVAC systems from SUTRAK. With this year's deliveries, the transit authority will have 174 buses equipped with ACE (air conditioning electric) roof-mounted systems. The patented Dual Loop technology provides for redundancy, as well as the ability to scale power requirements to the cooling needs of the vehicle. Once the desired temperature is achieved, one loop can shut down while the other maintains cooling to both sides of the vehicle. This saves power (parasitic load) taken from the engine and enhances fuel savings.

The ACE 238DLGS system was chosen for the new buses, which consists of two independent self-contained housings and an air-cooled generator, belt driven from the main engine. The BRT bus design required a reduced footprint housing (100 inches long) to allow for hybrid components on the roof. Each housing is completely free of external refrigerant or heater hose runs, reducing all maintenance of such items. Internally mounted compressors and the optional electric resistance heat make this design possible. The hermetic scroll compressor technology is superior to reciprocating and screw type designs and offers significantly higher efficiencies.

Ad Loading...

A power package gives AC voltage to the system and all evaporator and condenser motors utilized operate from it. This gives major components in the system a great reliability advantage over traditional 24-volt DC designs that require more routine replacement intervals. As an electric system, the option of adding shore power connection can reduce or eliminate idling whereever a connection to external power exists. The reliability and efficiency of this technology gives it a very bright future, according to the company.

More Bus

Cover of METROspectives episode with The Bus Coalition
BusMarch 20, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
County and agency officials break ground in front of a red and yellow King County Metro public transit bus.
Busby StaffMarch 20, 2026

Seattle’s King County Breaks Ground on RapidRide I Line to Expand High-Capacity Transit

The 17-mile RapidRide I Line will bring faster, more frequent service and improved regional connections across South King County.

Read More →
paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →
Ad Loading...
Cover photo for METROspectives with The Bus Coalition
Busby Alex RomanMarch 13, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Ad Loading...
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
Ad Loading...
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →