METRO Magazine Logo
MenuMENU
SearchSEARCH

YCON to install L.A. energy storage substation

The WESS is largely funded by the Federal Transit Administration under the Transit Investments for Greenhouse Gas and Energy Reduction with funds made available by the American Recovery and Reinvestment Act of 2009.

November 14, 2012
2 min to read


YCON, designer and manufacturer of energy storage flywheel systems, announced it was awarded a $3.6 million contract by the Los Angeles County Metropolitan Transportation Authority (Metro) to install a Wayside Energy Storage Substation (WESS) at the L.A. Metro Red Line Westlake/MacArthur Park Station utilizing VYCON's REGEN clean energy flywheel systems.

The WESS is largely funded by the Federal Transit Administration under the Transit Investments for Greenhouse Gas and Energy Reduction with funds made available by the American Recovery and Reinvestment Act of 2009.

Ad Loading...

VYCON's clean energy high-speed flywheel technology will recycle part of the energy in the system by absorbing and storing in kinetic form energy regenerated by braking trains in the line and returning this stored energy to trains in acceleration in a clean, instantaneous form. This recycling of energy will save electricity otherwise wasted in the form of heat.

VYCON's REGEN flywheel system captures the wasted energy at cycles as low as once per minute and can scale up in power capacity with parallel systems.

The new WESS system will also demonstrate how it can replace Traction Power Substations with voltage levels support, lower the cost of peak power demands, reduce energy consumption, decrease resistor bank and/or friction heat generation (wasted energy), and lower power demands to the utility during critical peak power usage.

Over the next year, VYCON plans to collaborate with several transit agencies around the world to install demonstration sites that will provide real-world data for energy and power savings as well as validating REGEN's ability to eliminate voltage sag issues, and most importantly, the ability to replace chemical battery-based Traction Power Substations.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →