Loading data...
North County Transit District is adding the system to all COASTER trains, along the wayside, and in the control office. The Rail Safety Improvement Act of 2008 requires fully functional PTC systems to be in place on railroads, such as the COASTER, by December 31, 2015.
Read More →Wabtec's I-ETMS PTC System will be implemented on select trains that share BNSF tracks on the Metrolink 91 Line, Orange County Line and Inland Empire-Orange County Line.
Read More →Line 10 includes two phases: phase one, which started revenue service in 2010, is around 23.4 miles long with 31 stations, and phase 2, which will add around 6.2 miles and 6 stations
Read More →Proposed amendments would eliminate the need to perform analyses on forgoing PTC installation and rerouting shipments of some hazardous materials off a rail line. Lines used to provide passenger service would still require PTC. Affected railroads are expected to realize an estimated cost savings of $340 million in the first several years
Read More →By mid-year, the new system will allow passengers to sign up for text messages and e-mail notifications with train status updates. The system will also be integrated with current social media sites, displaying the same information on the agency's Facebook and Twitter pages.
Read More →Train control systems such as PTC are now mandatory for most passenger rail operations and for trains hauling certain hazardous materials, but are not required for closed passenger rail systems such as light rail, rapid transit and subways.
Read More →With the grant funding, Metra plans to help fund installation of PTC on its Milwaukee West Line to Elgin and North line to Fox Lake.
Read More →In total, will equip 90 freight and commuter locomotives with its I-ETMS train control technology.
Read More →Under PTC, the crew of a train must initialize the system (enter train and route information) before each individual run.
Read More →Equipment will permit researchers to realistically simulate innumerable conditions and scenarios encountered during railroad operations to help identify safety problems and develop effective solutions.
Read More →