Loading data...
The initial study will be on the feasibility of a new passenger rail line. Based on the results of this study, environmental analysis, a Service Development Plan and preliminary design may follow.
Read More →With a similar grant, Amtrak equipped a Heartland Flyer train operating between Oklahoma City, Okla. and Ft. Worth, Texas to run on a biodiesel blend known as B20, which is 20 percent pure biofuel and 80 percent diesel.
Read More →Awards vary in size and scope ranging from $500,000 to $2M , and include private corporations, academic institutions and public authorities. Recipients include Southern California Regional Rail Authority, Amtrak and New York Metropolitan Transit Authority.
Read More →Recipients include California ($901 million) for the construction of new lines in the Central Valley; Florida ($800 million) for the Tampa to Orlando corridor; and Iowa ($230 million) to create a new intercity passenger rail service between Iowa City and Chicago.
Read More →Funds will be used to install continuously welded rail and other track improvements, new crossties, and highway-rail grade crossing safety improvements on track owned by the New England Central Railroad, a RailAmerica Inc. property.
Read More →Amtrak is the fourth railroad to join the Confidential Close Call Reporting System. Under the program, employees can report “close call” incidents that did not result in an accident without fear of sanction or penalty from the railroad or the federal government.
Read More →Agency seeking support to improve trip times, reliability and capacity on the Trenton to New York section of the corridor owned by Amtrak.
Read More →Requests total more than $8.5 billion and will be considered for funding from more than $2.3 billion appropriated in FY 2010.
Read More →Will perform engineering and operations services to support the development and application of advanced research and technologies for enhanced rail safety.
Read More →Wisconsin DOT will complete preliminary engineering and final design work, conduct program management activities and complete environmental management plans for the Milwaukee-to-Madison high-speed rail corridor that will operate at speeds of up to 110 miles per hour.
Read More →