
Siemens to refurbish 32 Calgary Transit light rail vehicles, among many other rail service projects, at new 60,000 square-foot facility.
Read More →
The unresolved safety findings cover nearly every aspect of Metro’s rail operations: maintenance, training, derailments, emergency egress, evacuations, fires, red signal violations and workplace issues.
Read More →
The project, awarded by Spain's Administrator of Railway Infrastructure has a total value of approximately $185 million.
Read More →The Southeastern Pennsylvania Transportation Authority’s Regional (commuter) Rail system was inherited from the Pennsylvania and Reading Railroads and the infrastructure in many sections of the system has been serving the Philadelphia area for more than 100 years. Fifteen years ago, overhead catenary system (OCS) failures were a common occurrence on SEPTA Regional Rail, a result of fatigue cracks and wear. The all too common OCS failures were frustrating for SEPTA customers who occasionally found it difficult to depend on train service for their travels and for SEPTA, whose crews were constantly working to repair and maintain the system.
Read More →
The contract, which is for a ten-year period with the option to extend another 5 years, covers maintenance and spare parts on 74 four-car Class 357 ELECTROSTAR trains and is valued at approximately $213 million.
Read More →
Take a ride on a Track Geometry Car, part of the specialized fleet that inspects the rails of the NYC subway.
Read More →Maintenance and construction projects can present quite the conundrum for transportation organizations with rail operations: shut down a major portion or entire line in one shot to get the work done while offering substitute service for riders? Work overnights and weekends for long stretches of time? One solution to the maintenance/construction puzzle is the “blitz” — a balancing act between productivity and customer inconvenience.
Read More →Problems such as increased wait times for trains due to single track use, stemming from deteriorating conditions, caused a nearly 25% drop in ridership last year for the 30-year-old system.
Read More →Follows the completion of extensive safety testing, the review of replacement parts, and inspections of the overall vehicle and railroad infrastructure by the FRA and the California Public Utilities Commission.
Read More →Completed phase one and two of the process, which included creating an enclosed structure over two tracks and a new three-story maintenance warehouse and administrative office that replaced functions formerly performed in trailers.
Read More →