Loading data...
The 2025 analysis finds motorcoach travel supported nearly 900,000 jobs and generated $28 billion in federal, state, and local taxes.
Read More →Shifts are long and varying, and facilities are often inadequate for transit employees to truly recharge and stay sharp on the job. But it doesn’t have to be that way. The quality of the environment within facilities can be designed to support shift workers and those with jobs that don’t follow traditional 9-to-5 schedules. Two key elements that can be utilized to support vehicle operator health; creating spaces with adaptability for varied activities and quality lighting that supports the adaptability of the space.
Read More →Officials break ground on the region's second paratransit transfer facility for the south suburbs.
Read More →Peter Pantuso told members of the House Transportation and Infrastructure Committee that motorcoach transportation in the U.S. continues strong growth and remains exceptionally competitive against other modes of transportation, especially considering that Amtrak remains heavily subsidized by the federal government.
Read More →Portland Police Bureau, Multnomah County Sheriff’s Office, and Port of Portland Police Department additions increase Transit Police staffing to 31.
Read More →When panic surrounding the coronavirus began to ramp up in my area, I’ll admit, I was right there with everyone else stockpiling up...
Read More →Currently three-quarters of Sun Tran’s fleet exclusively utilizes biodiesel fuel, which is a domestically produced, renewable fuel that can be manufactured from vegetable oils, animal fats or recycled restaurant greases.
Read More →Coaches are equipped with a Cummins ISL 345 HP engine, Allison B500 transmission and three-point seat belts. The David Thomas Tours coach is also equipped with REI audio/video, Alcoa rims and 110-volt plug outlets.
Read More →Awards handed out annually to vendors that consistently provide outstanding service.
Read More →New amount covers improvements to the project’s design and scope and also provides for an additional 7% contingency that could be used to cover unforeseen site conditions along the project route that may arise during construction.
Read More →