Sun Metro celebrates grand opening of BRT
The 8.6-mile Rapid Transit System provides a high-capacity transit service to El Paso, Texas for the first time.


Sun Metro celebrated the grand opening of its 8.6-mile Rapid Transit System (RTS) along the Mesa Corridor in El Paso, Texas, this week. The new BRT system, which provides a high-capacity transit service to El Paso for the first time, begins at the Downtown Transfer Center, travels along Santa Fe, Franklin, Oregon, Glory Road and Mesa, ending at the Westside Transfer Center. Planning, engineering and program management firm Lockwood, Andrews & Newnam Inc. (LAN) led the design of the project.
“We have dedicated nearly 6 years to analyzing, designing and building what we believe will revolutionize public transportation in our community,” said Sun Metro Director Jay Banasiak.
Known as the Sun Metro Brio, the new BRT system uses modern, rubber-tire, high-capacity vehicles, improved fare collection systems and controlled traffic signals to move riders more efficiently. Uniquely branded 60-foot articulated buses with low-floor boarding will transport more than 70 passengers between the terminal stations every 10 minutes during peak period and 15 minutes during off‐peak period for 14 hours a day, Monday through Friday.

Passenger amenities include an integrated intelligent transportation system (allows buses to pass quickly through traffic lights), an audio/visual system to provide destination and next stop information inside and outside vehicles, bicycle racks, Wi-Fi connections and wheelchair accommodations. The corridor also includes 22 BRT transit stations about a mile apart. The station areas include two bus shelters at each stop, street lighting, landscaping, bike racks, ADA‐accessible ramps and station platforms, and reconstructed sidewalk at all approaches.
“Sun Metro Brio’s grand opening provides a new, efficient, and enhanced public transit service option for the citizens of El Paso,” said Philip L. Meaders, P.E., LAN’s vice president. “The new service will cut commuting times for many residents, workers, students and seniors who are traveling to different destinations while reducing congestion in the community.”
The Mesa Corridor is the first of four RTS corridors approved by the City of El Paso. The second corridor will be in Alameda. Construction on Alameda is tentatively scheduled to begin in spring 2015 with completion in 2016. Dyer and Montana, the third and fourth RTS corridors, are tentatively scheduled to be operational in 2017 and 2019, respectively.
More Paratransit

Reinventing Fleet Maintenance with Real-time Visibility and AI
Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.
Read More →
SamTrans Sets Priorities for Potential Connect Bay Area Revenue
The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.
Read More →
Chicago's NITA Act Moves Into Next Phase as Service Improvements Begin
Rider-focused improvements will begin rolling out across the system immediately as CTA, Metra, and Pace increase service this summer in the six-county region.
Read More →A True Low-Floor Minibus Design Delivers Better Accessibility and Efficiency for Everyone
As transit demands evolve, so should your fleet. Download the whitepaper to see how the Low-Floor Frontrunner Minibus compares to traditional options.
Read More →2026 METRO Buyer’s Guide & Directory
Searching for the right vehicles, technology, equipment, or services for your public transit or motorcoach operation? This industry guide brings together manufacturers and suppliers from across the transportation market — all in one place. Download it to connect with the companies that help agencies and operators improve mobility, enhance operations, and move their organizations forward.
Read More →
Rays the Mark Foundation to Honor CDTA’s Emily DeVito at October Fundraiser
Event at Chicago-area Ravisloe Country Club will support DeVito, a transit employee and mother of twins battling kidney failure and awaiting a transplant.
Read More →
King County Test Heliox Chargers, Keolis Lands California Contract Top Biz Briefs
Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.
Read More →
Spare Expands AI-Native Operations Platform With Fixed-Route Capabilities
The launch marks a major milestone in Spare’s vision for unified transit operations.
Read More →
Via Announces Scheduling and Supply Studio
The Scheduling and Supply Studio provides the world’s first fully integrated platform for optimizing vehicle and driver availability to rider demand, said company officials.
Read More →
Boston's MBTA Completes Latest Green Line Work
The work took place during 12 consecutive days of shuttle bus service replacement between Kenmore and Cleveland Circle.
Read More →