METRO Magazine Logo
MenuMENU
SearchSEARCH

Metrolink Expands 'Smart Crossing' Tech

Made possible by grant funding from the CRISI program, this pioneering technology creates a better experience for drivers and pedestrians while increasing safety for Metrolink passengers.

Metrolink Expands 'Smart Crossing' Tech

The WCNSS system will eliminate the “ghost train” phenomenon that has plagued San Juan Capistrano residents.

Photo: Metrolink

2 min to read


Southern California’s Metrolink implemented cutting-edge “smart crossing” technology, known as a Wireless Crossing Nearside Station Stop (WCNSS) system, at the Del Obispo Street crossing near the San Juan Capistrano Station in Orange County.

Made possible by grant funding from the Consolidated Rail Infrastructure and Safety Improvements (CRISI) program, this pioneering technology, which went live at the crossing on June 1, creates a better experience for drivers and pedestrians while increasing safety for Metrolink passengers and the San Juan Capistrano community.

Ad Loading...

Metrolink’s WCNSS System

Specifically, the WCNSS system will eliminate the “ghost train” phenomenon that has plagued San Juan Capistrano residents.

Previously, on approach to the San Juan Capistrano Station, trains would trigger the safety features at the downstream Del Obispo Street crossing. While the train was stopped at the station, the gate arms would recover — creating a “ghost train” effect — before the safety mechanism was once again triggered as the train left the station.

Upgrading crossings with the WCNSS system reduces traffic congestion and prioritizes safety by reducing wait times and deterring dangerous behavior, such as drivers and pedestrians bypassing activated crossing gates.

Metrolink continues to pursue new and emerging technologies to improve system performance and provide seamless and safe commuting experiences for passengers and the communities throughout Southern California in which Metrolink trains operate.

Initially, the new WCNSS system at the Del Obispo Street crossing will prevent southbound Metrolink trains scheduled to stop at the San Juan Capistrano Station from activating the crossing’s safety features until it has left the station.

Ad Loading...

WCNSS technology is not yet available for other passenger train services operating on Metrolink’s rail lines, though plans to expand to Amtrak Pacific Surfliner are ongoing. Freight traffic will not be affected, as freight trains do not stop at the San Juan Capistrano Station.

Building WCNSS Implementation

Earlier this year, California Senators jointly secured $1.6 million in FY24 appropriations funding for Metrolink to support the installation of “smart crossing” technology at additional rail crossings.

Metrolink continues to collaborate with local, state, and federal partners with the long-term goal of implementing WCNSS systems at 52 crossings located within one-half mile of Metrolink stations.

The first WCNSS systems installed on Metrolink’s network were developed, certified, and deployed for the Arrow service at seven crossings in the cities of San Bernardino and Redlands. Metrolink has been operating WCNSS technology since October 2022, when the Arrow service launched.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →