
Trinity Metro Breaks Ground on $270M TEXRail Extension
The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.
Read More →
The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.
Read More →
In a letter, the FTA denied the City of Honolulu’s request to extend the deadline for the so-called recovery plan until the end of June.
Read More →
The special directive is based on 22 findings from an FTA investigation report into the condition and safety performance of the Metrorail TPE system, which was also released on Friday.
Read More →
Known as a passive threat analysis system, the equipment monitors riders by measuring body density as they pass by, but doesn't require them to stop and empty their pockets to be checked.
Read More →
A marketing company could be hired by early next year to entertain offers and assign prices for naming rights of hundreds of Metro assets, the report said.
Read More →
Some lawmakers expressed concern as to whether NJ Transit would be able to implement positive train control by the federally mandated deadline of Dec. 31, 2018.
Read More →
Due to circulate on line 4, the MP14 trains will help to increase the capacity and quality of transport on the line, with a targeted global service equivalent to that of line 1.
Read More →
Chanel says it will leave Grasse, dubbed the perfume capital of the world, unless plans are dropped to drive a TGV line through the fields of flowers required to make the world’s most famous scent
Read More →
This new system, which has been in the works for more than a year, will enable employees to clock in and out by swiping their finger and tapping in a personalized PIN number.
Read More →
Tim Keith becomes president and will lead capital raising and external affairs.
Read More →
The executive director job, which comes with a salary of up to $185,000 a year, was first spelled out in a 2015 contract between the RTA and its operator, Transdev.
Read More →