
DART Customer Satisfaction Reaches Six-Year High
Overall satisfaction rose to 74.9%, while the agency’s Net Promoter Score reached a record 33.7.
Read More →
Overall satisfaction rose to 74.9%, while the agency’s Net Promoter Score reached a record 33.7.
Read More →
Eddie Robar said his departure has been in the works since he was contacted by Edmonton's transit system, which is three times the size of Halifax’s, in July.
Read More →
State Department of Taxation officials have pointed to a lag in processing tax returns as a key reason for the swings. HART officials, meanwhile, said they still don’t fully understand what’s causing the swings.
Read More →
The rail extension was built by the Metro Gold Line Foothill Extension Construction Authority, an independent transportation planning and construction agency. The line took approximately five years to build, with major construction completed in September 2015.
Read More →
Recently recognized during the National Railroad Hall of Fame’s 2015 Induction Ceremony for Edward Gowen Budd, founder of the Edward G. Budd Manufacturing Co. in Philadelphia in 1912.
Read More →
The contract, valued at $18.8 million, includes completely stripping down the vehicle frames, repairing and replacing structural carbody components, a complete rewiring, truck remanufactures, door upgrades, and integration of modern technologies to provide a modern transit solution wrapped in a nostalgic, historical package.
Read More →
Sacramento Regional Transit Board of Directors passed a new set of rules Monday night that kicks people off of RT buses and trains who become a public nuisance.
Read More →
Plans for a new rapid bus system to expand public transit as a low-cost alternative to Metrorail in the area prompted the Miami Herald to ask local CEOs there thoughts on which mode is more desirable.
Read More →The 2016 budget also introduces, builds on and accelerates several new initiatives, service improvements, and technology upgrades to benefit riders and improve the customer experience.
Read More →
He spearheaded the preparation and funding for the 2000-2004 Capital Program, which at the time was the most ambitious and far-reaching program in MTA history.
Read More →
Specifically, FTA will ensure and verify that WMATA implements the 78 corrective actions related to Metrorail as well as the more than 200 other corrective actions previously approved by the TOC, but still unfulfilled by WMATA, some dating as far back as 2008.
Read More →