METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom supplying core systems for China's driverless metro line

Nanjing Line 7 is a key metro line in Nanjing’s metro network, which includes 27 stations that connect the southwest to the northeast of the city.

July 17, 2019
Alstom supplying core systems for China's driverless metro line

Nanjing Line 7 is the eighth driverless metro line in China including Alstom solutions.

Alstom

1 min to read


Nanjing Line 7 is the eighth driverless metro line in China including Alstom solutions. Alstom

Alstom signed a contract with Nanjing Metro to provide traction systems and the train control and monitoring system (TCMS) for 318 metro cars that will run on Nanjing Line 7, the first driverless metro line in the Chinese city. Alstom, with its global experience in unattended train operation (UTO), will also provide technical review for the system.

Alstom will provide the OptONIX traction system, which was developed specifically for the Chinese market. Alstom’s joint venture, Shanghai Alstom Transport Electrical Equipment Co. Ltd. (SATEE), will manufacture the traction systems with support from Alstom sites in Belgium, France, and India. Alstom’s joint venture in Xi’an, Xi’an Alstom Yongji Electric Equipment Co. Ltd will supply the traction motors.

Ad Loading...

Nanjing Line 7 is a key metro line in Nanjing’s metro network, which includes 27 stations that connect the southwest to the northeast of the city. According to the long-term metro network development plan of Nanjing, Line 7 will have interchange stations with 11 metro lines in the future.

Nanjing Line 7 is the eighth driverless metro line in China including Alstom solutions. The company has been present in Nanjing for 20 years as a major supplier of metros, traction systems, signaling systems, and services.

More Rail

Ribbon cutting at Siemens' new North Carolina facility.
Railby StaffApril 9, 2026

Siemens Opens North Carolina Railcar Manufacturing Facility

Site construction is complete, production is underway, and the first locally built passenger coaches are on track for delivery in Summer 2026.

Read More →
Two MBTA railcars in station.
Railby StaffApril 9, 2026

MBTA Completes Key Red Line Signal Upgrade Weeks Early

Crews completed a significant portion of the testing required before commissioning the new, digital signaling system, which will bring important upgrades that strengthen Red Line service reliability for riders and provide Red Line Operations the ability to route trains more quickly, turn trains around faster, and recover from unplanned disruptions more efficiently, said MBTA officials. 

Read More →
A Metra train on the rails
Railby StaffApril 8, 2026

Metra Reveals 2026 Construction Program

In addition to new projects, progress continues on a multiyear effort to upgrade track, electrical, and signal systems on the Metra Electric Line to accommodate the expansion of service on the South Shore Line.

Read More →
Ad Loading...
Governor Moore speaking at Maryland light rail station
Managementby StaffApril 7, 2026

Governor Advances Transit-Oriented Development in Baltimore

The Maryland Transit Administration is advancing the nearly $1.4 billion Light Rail Modernization Program, which modernizes the Baltimore Central Light Rail Line from Hunt Valley to BWI Thurgood Marshall Airport with new, low-floor vehicles and upgrades to all light rail stations, systems, and maintenance facilities.

Read More →
A fleet of Caltrain electrified trains on tracks
Railby StaffApril 3, 2026

Funding Gap Could Force Caltrain to Slash Service, Close Stations

The Peninsula Corridor Joint Powers Board recently met for a budget workshop, during which staff outlined the significant service reductions Caltrain could be forced to make without new external funding. 

Read More →
SEPTA's Exo railcars
Railby StaffApril 2, 2026

SEPTA Purchases Montreal Coach Cars to Bolster Regional Rail Fleet

Funding for the purchase of the railcars comes from the nearly $220 million in additional capital dollars Gov. Josh Shapiro allocated in November 2025 to support urgent safety upgrades and infrastructure improvements.

Read More →
Ad Loading...
The South Shore Line with Passengers
Railby StaffApril 1, 2026

South Shore Line Extension Debuts, Boosting Rail Access in Northwest Indiana

The $945 million project connects four new stations and expands regional mobility.

Read More →
A rendering of a California High-Speed Rail vehicle
Railby StaffApril 1, 2026

High-Speed Rail May Boost Brain Health, New Study Finds

Research ties rail access to lower depression, better cognition and improved air quality.

Read More →
An MBTA commuter rail at a station.
Railby StaffMarch 31, 2026

Massachusetts Announces Summer Savings for Commuter Rail Riders

With major events and increased travel expected across the state this summer, the Administration is focused on making sure people have a reliable, affordable alternative to driving so we can reduce congestion, support daily commuters, and keep Massachusetts moving.

Read More →
Ad Loading...
A Sound Transit Crosslake Connection Link light rail vehicle
Railby StaffMarch 30, 2026

Sound Transit Opens Crosslake Connection, Completing Link 2 Line

The final seven-mile segment of the 2 Line includes new stations at Mercer Island and Judkins Park and connects to the 1 Line at the International District/Chinatown Station. The Link light rail system now spans 63 miles and includes 50 stations.

Read More →