METRO Magazine Logo
MenuMENU
SearchSEARCH

Bombardier Joint Venture to Provide Propulsion, Control Equipment in China

This most recent contract is for Beijing Metro Line 16 and its scope includes engineering, manufacturing, testing, commissioning as well as the initial delivery of spare parts for traction converters.

September 9, 2015
Bombardier Joint Venture to Provide Propulsion, Control Equipment in China

Beijing Subway Line 2 Train by Jucember via Wikimedia Commons

2 min to read


Beijing Subway Line 2 Train by Line2Train" by Jucember - Own work. Licensed under CC BY-SA 3.0 via Commons." target="_blank">Jucember via Wikimedia Commons

Bombardier Transportation announced that its joint venture Bombardier CPC Propulsion System Co. Ltd. (BCP), has signed another contract with the Chinese New United Group (NUG) to provide MITRAC propulsion and control equipment for the Beijing Mass Transit Railway Operation Corp. This is the fourth contract that the joint venture has signed for Chinese urban mass transit systems in 2015.

The total value of this year's four contracts is approximately $136 million. BT's direct share in the four contracts is valued at approximately $30 million. Bombardier owns 50% of the shares in BCP and the joint venture is jointly controlled by Bombardier and New United Group.(1)

Ad Loading...

This most recent contract is for Beijing Metro Line 16 and its scope includes engineering, manufacturing, testing, commissioning as well as the initial delivery of spare parts for traction converters.

Jianwei Zhang, president and chief country representative, Bombardier China, said, "This latest order is one of our eleven public tenders won in China for propulsions and control equipment since 2014. We are very proud to continuously power the rapid development of Chinese urban mass transit systems with our proven and reliable technology. As always, Bombardier is committed to delivering high quality products on time."

The equipment for the recent four contracts will be supplied from Bombardier Transportation's facilities in Vasteras, Sweden and Changzhou, China. Once delivered, Chinese vehicle manufacturers will mount the components on metro trains for operation in the Chinese cities of Beijing, Shanghai, Shenzhen and Tianjin.

With eleven public tenders won since 2014, the Bombardier joint venture will supply the Chinese market with more than 2,500 metro cars equipped with MITRAC propulsion equipment.

(1) Contract for Beijing Metro Line 16: Total JV value: $57 million. Bombardier direct share : $9 million
Contract for Shanghai Line 9, Phase 3: Total JV value: $29 million. Bombardier direct share: $9 million
Contract for Shenzhen Line 7: Total JV value: $27 million. Bombardier direct share: $8 million
Contract for Tianjin Line 5: Total JV value: $23 million. Bombardier direct share: $4 million

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →